Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Water and Wastewater
  5. ›REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2…

City of Redlands·California

REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID

Closes 11/12/2026$2M – $4MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Redlands is seeking a qualified contractor to execute Phase 2 upgrades of its Wastewater Treatment Plant. The contract includes full‑service project management, labor, materials, equipment, and all necessary construction activities to modernize the plant’s headworks, primary clarifiers, peak‑ponds, effluent pump station, digestion system, aeration basins, and plant‑wide electrical and control systems, along with civil, structural, and seismic retrofits. Bidders must hold a California Class A contractor license, provide a 10 % bid bond, and be able to furnish 100 % performance and labor‑material bonds. The work must be started within ten days of the Notice to Proceed and completed within 900 calendar days, with liquidated damages of $1,000 per day for overruns. The project is subject to prevailing‑wage, Buy‑America, and DBE good‑faith‑effort requirements. • Comprehensive plant‑wide upgrades covering mechanical, electrical, civil, and structural systems. • Requires Class A licensing, DIR registration, and substantial bond guarantees (10 % bid bond, 100 % performance & labor‑material bonds). • Fixed schedule: start within 10 days of NTP, 900‑day completion period; liquidated damages $1,000/day. • Estimated contract value $39 million; strong emphasis on SCADA integration, redundancy, and seismic retro‑fit.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Goutam Dobey(Project Manager)

[email protected]

(909) 798-7584

Key dates

Opened
9/30/2026
Closes
11/12/2026
Duration
900 calendar days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
521006

Budget estimate

$2,000,000 – $4,000,000

The solicitation lists an estimated contract value of $39,000,000. Considering typical profit margins for large public‑works (5‑10 %), the contractor’s net earnings would likely fall between roughly $2 M and $4 M. Variations will depend on the final bid price, change‑order volume, and efficiency of project execution.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bakersfield·California

Top match · 85%

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

City of Redlands·California

85% match

PMP 2026 Street Resurfacing Project

Closes 10/29/2026Opened 10/8/2026

The Metropolitan Water District of Southern California·California

84% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/3/2026Opened 9/4/2026

Oregon Clackamas County·Oregon

84% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/10/2026Opened 10/7/2026

Central Contra Costa Sanitary District·California

84% match

RFP: Construction Management Services for the Ultraviolet Disinfection Replacement, District Project 100012 (RE-ISSUE)

Closes 11/13/2026Opened 10/13/2026

City of Redlands·California

84% match

2026 Alley Paving Improvement Project

Closes 10/27/2026Opened 10/8/2026

NYC Department of Environmental Protection (NYCDEP)·New York

83% match

R156-RO2-DB Upgrade of the Main Sewage Pump and Power Distribution Systems at the Rockaway Wastewater Resource Recovery Facility

Closes 11/20/2026Opened 10/13/2026

City of Santa Rosa·California

83% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 10/27/2026Opened 9/29/2026

City of Redlands·California

83% match

2026 CIP SEWER PIPELINE & MANHOLE REPLACEMENT PROJECT

Closes 10/29/2026Opened 10/13/2026

City of Roseville·California

83% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

Rancho Murieta CSD·California

83% match

RFP for Wastewater Treatment Plant Filter Bed Rehabilitation

Closes 10/22/2026Opened 9/15/2026

City of Bakersfield·California

83% match

WASTEWATER TREATMENT PLANTS NO.2 AND 3 SEPTAGE RECEIVING STATION IMPROVEMENTS

Closes 10/29/2026Opened 10/1/2026

City of Palm Springs·California

83% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/9/2026Opened 10/13/2026

City of Kyle·Texas

83% match

KYLE WWTP EXPANSION PHASE 2, FULL WORKS PACKAGE

Closes 10/22/2026Opened 8/31/2026

City of Hollywood·Florida

82% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

82% match

Wastewater Treatment Plant Upgrades – Albert C. Wagner Correctional Facility

Closes 10/22/2026Opened 9/3/2026

City of Brookland·Arkansas

82% match

Wastewater Treatment Facility Headworks Improvements

Closes 10/27/2026Opened 10/4/2026

City of Sanibel·Florida

82% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

Town of Ipswich·Massachusetts

82% match

Ipswich Water Treatment Plant

Closes 10/26/2026Opened 8/12/2026

City of Roseville·California

82% match

Design-Assist Construction of Pleasant Grove Wastewater Treatment Plant Electrical Power System Capacity Expansion Project

Closes 10/28/2026Opened 9/2/2026

City of Santa Barbara·California

82% match

Transmission Main Renewal Phase 2

Closes 10/23/2026Opened 9/10/2026

City of Hollywood·Florida

82% match

Headwork Scrubber Rehabilitation (Project No. 23-9219)

Closes 11/10/2026Opened 10/6/2026

Maryland Environmental Service - Procurement Division·Maryland

82% match

Dorsey Run Wastewater Treatment Plant Minor Upgrades - MBE 20%

Closes 11/6/2026Opened 9/23/2026

Western Municipal Water District·California

82% match

WRCRWA Primary Clarifier #2 Rehabilitation

Closes 10/26/2026Opened 9/24/2026

City of Hollywood·Florida

82% match

Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)

Closes 10/28/2026Opened 9/9/2026