Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Vermont
  4. ›Closed bids
  5. ›Engineering Services – Preliminary Design & Feasibility for Removal…

Poultney Mettowee Natural Resources Conservation District·Vermont

Engineering Services – Preliminary Design & Feasibility for Removal of Three Low-Head Dams, Castleton River

Closes 9/7/2026$50k – $70kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Poultney Mettowee Natural Resources Conservation District is seeking a qualified engineering consultant to conduct a preliminary design and feasibility assessment for the removal of three low-head dams on the Castleton River in Fair Haven, Vermont. The project aims to restore the river to a free-flowing and naturally functioning stream channel, improving ecological connectivity, in-stream and riparian habitat, aquatic organism passage, water quality, sediment transport continuity, flood resilience, and public safety. The selected consultant will evaluate existing site conditions, quantify anticipated project outcomes, and develop conceptual preliminary design documents for preferred alternatives at approximately 30% design level. • The project includes the removal of three low-head dams: Shirt Factory Dam, Slate Factory Dam, and Water Street Dam. • The consultant will evaluate dam safety considerations, site access and constructability, sediment quantity and potential contamination, topographic and hydraulic conditions, channel stability and geomorphology, aquatic habitat restoration potential, and infrastructure risk and resilience considerations. • The project requires stakeholder coordination, site investigations, and a comprehensive review of permitting and regulatory requirements. • The selected consultant will provide final deliverables, including a feasibility assessment report, preliminary design memorandum, preliminary design drawings, hydraulic modeling documentation, sediment assessment summary, regulatory pathway memorandum, GIS and CAD deliverables, and an opinion of probable costs for final design and implementation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Hilary Solomon(District Manager)

[email protected]

(802) 558-3515

Key dates

Opened
8/14/2026
Pre-bid meeting
8/24/2026
Site visit
8/24/2026
Closes
9/7/2026
Projected award
9/22/2026
Duration
14 months

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
75065

Budget estimate

$50,000 – $70,000

The budget for this project is estimated to be around $60,000, which is the available project funding through the WUV Enhancement Dam Removal Design and Implementation Block Grant (DIBG). This estimate is based on the project's scope of work, which includes a preliminary design and feasibility assessment for the removal of three low-head dams. The budget may vary depending on the complexity of the project, the consultant's expertise, and the level of detail required for the final deliverables.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

North Carolina City of Marion·North Carolina

Top match · 75%

Engineering & Design Services for Dam Decommission Project

Closes 10/16/2026Opened 9/25/2026

Virginia Department of Wildlife Resources·Virginia

73% match

Lunsford Mill Dam Removal

Closes 10/21/2026Opened 9/21/2026

U.S. Department Of Defense·Kentucky

73% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Massachusetts Town of Bolton·Massachusetts

72% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Town of Cumberland·Rhode Island

72% match

Addendum #3: Rawson Pond Dam Spillway Replacement

Closes 10/13/2026Opened 10/13/2026

City of Ann Arbor·Michigan

72% match

Professional Engineering Services for Dam Support

Closes 11/10/2026Opened 10/1/2026

City of Cumberland·Rhode Island

71% match

Rawson Pond Dam Spillway Replacement

Closes 10/13/2026Opened 9/21/2026

Charleston·South Carolina

71% match

N. Nassau Street Pipe Replacement Project RFQ (Design Services)

Closes 10/30/2026Opened 10/7/2026

Texas Brazos River Authority·Texas

71% match

Hydrostatic Pressure Relief System Assessment and Downstream River Channel Improvements at Sterling C. Robertson Dam

Closes 10/20/2026Opened 8/17/2026

North Carolina City of Raleigh·North Carolina

71% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

U.S. Department Of The Interior·Colorado

71% match

CHOH 326202 Repair Historic Potomac River Dams 4 a

Closes 10/15/2026Opened 9/15/2026

Joint Meeting of Essex and Union Counties·New Jersey

71% match

FOR THE PROVISION OF ENGINEERING SERVICES

Closes 10/20/2026Opened 9/18/2026

Laramie Rivers Conservation District·Wyoming

71% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Massachusetts Town of Duxbury·Massachusetts

71% match

Design Services Alarms and Backup Power Solutions for 3Sewer Lift Stations

Rolling / TBD closeOpened 7/3/2024

Michigan Department of Technology, Management & Budget (DTMB)·Michigan

71% match

751/26442.JBB; Hancock Creek Dam - Dam Evaluation

Closes 10/15/2026Opened 10/12/2026

Boone County·Kentucky

71% match

PROFESSIONAL ENGINEERING AND DESIGN SERVICES

Closes 10/30/2026Opened 10/8/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

71% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

State of Delaware NAT·Delaware

71% match

Architectural Engineering Design Services for Capital Improvements

Closes 11/9/2026Opened 10/5/2026

City of Port Angeles·Washington

70% match

RFQ Ennis Creek Force Main Removal

Closes 10/30/2026Opened 10/1/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

70% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Sarasota County·Florida

70% match

Engineering Services for Carlton Water Treatment Plant Backup Power Improvements

Closes 10/15/2026Opened 9/1/2026

City of Cedar Rapids·Iowa

70% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Mount Ascutney Regional Commission·Vermont

70% match

Design Engineering: East Hill Rd Culvert Replacement

Closes 10/23/2026Opened 9/28/2026

NYS Ulster County·New York

70% match

LOWER ESOPUS CREEK FLOOD STUDY

Closes 10/16/2026Opened 9/18/2026