Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Vermont
  4. ›Closed bids
  5. ›Cilley Hill Dam Removal Study and Preliminary Design, Jericho, Vermont

Winooski Natural Resources Conservation District·Vermont

Cilley Hill Dam Removal Study and Preliminary Design, Jericho, Vermont

Closes 3/9/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Winooski Natural Resources Conservation District is seeking a contractor to conduct a feasibility study and preliminary design for the removal of the Cilley Hill Dam in Jericho, Vermont. The study will assess the logistics, obstacles, costs, benefits, and disadvantages of removing the dam. The contractor will be responsible for tasks such as data collection, hydrology calculations, alternatives analysis, and stakeholder meetings. The project is expected to be completed within 12 months. • The contractor will be required to submit a proposal that includes their qualifications, experience, and approach to the project. • The contractor will be responsible for coordinating with landowners and respecting private property during site visits. • The contractor will be required to provide a detailed breakdown of their costs and to identify any potential conflicts of interest. • The contractor will be expected to comply with all applicable laws and regulations, including those related to environmental protection and historic preservation. • The contractor will be required to provide regular progress reports and to participate in stakeholder meetings.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Daniel Koenemann(District Manager)

[email protected]

(802) 828-4493

Key dates

Opened
12/30/2025
Closes
3/9/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
72166

Budget estimate

$200,000 – $500,000

The budget for this project is estimated to be between $200,000 and $500,000, based on the scope of work and the requirements of the project. The final budget will depend on the contractor's proposal and the actual costs of the project. The factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the contractor, and the costs of any additional services or materials required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Mount Ascutney Regional Commission·Vermont

Top match · 73%

Design Engineering: East Hill Rd Culvert Replacement

Closes 10/23/2026Opened 9/28/2026

Town of Bennington·Vermont

71% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Central Vermont Regional Planning Commission·Vermont

70% match

Flood Study & Alternatives Analysis - Waterbury, Vermont

Closes 10/26/2026Opened 10/6/2026

Department of Buildings & General Services·Vermont

69% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Kentucky

69% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation·Massachusetts

69% match

Bellevue Pond Dam Rehabilitation

Closes 10/29/2026Opened 9/16/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Upgrade Dam Control Facilities – Shikellamy State Park

Closes 10/15/2026Opened 9/16/2026

Connecticut City of Norwich·Connecticut

68% match

REHABILITATION OF A 0.41 MILE SECTION OF HUNTERS ROAD AND CULVERTS REPLACEMENT

Closes 11/27/2026Opened 9/21/2026

North Carolina City of Raleigh·North Carolina

68% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

City of Keene·New Hampshire

68% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Virginia Department of Wildlife Resources·Virginia

68% match

Lunsford Mill Dam Removal

Closes 10/21/2026Opened 9/21/2026

Town of Clinton·Connecticut

68% match

Replacement of Bridge No. 06956, Country Village Lane

Closes 11/4/2026Opened 10/7/2026

Virginia Tech·Virginia

67% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

City of Keene·New Hampshire

67% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Northampton County·Pennsylvania

67% match

County of Northampton Gracedale Site Infrastructure Feasibility Study and Phased Development Plan

Closes 11/12/2026Opened 10/13/2026

Virginia Polytechnic Institute and State University·Virginia

67% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

Vermont Department of Economic Development (Vermont Business Registry and Bid System)·Vermont

67% match

Mountainside Resort Interconnection with Stowe Water System

Closes 10/30/2026Opened 10/1/2026

Sustainable Woodstock·Vermont

67% match

Barnard Brook at Woodstock Garden Bank Stabilization

Closes 10/20/2026Opened 9/17/2026

Delaware Valley Regional Planning Commission·Pennsylvania

67% match

Cobbs Creek Trail Extension: Forge to Refuge Trail Advanced Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 10/16/2026Opened 9/4/2026

Connecticut The Community Builders Inc·Connecticut

67% match

Master Planning Design Services for High Meadows Property

Closes 10/30/2026Opened 10/10/2026

Town of Manchester·Connecticut

67% match

ENGINEERING SERVICES - DRY BROOK CULVERT REPLACEMENT

Closes 11/10/2026Opened 10/13/2026

Connecticut Town of Windsor·Connecticut

67% match

Multidisciplinary Predevelopment Feasibility Study

Closes 10/30/2026Opened 10/9/2026

Connecticut Town of Montville·Connecticut

67% match

2027-02 - Engineering Report Request

Closes 10/26/2026Opened 8/24/2026

Central Vermont Regional Planning Commission·Vermont

67% match

Town of Middlesex - Emergency Watershed Protection Program 2026

Closes 10/27/2026Opened 10/8/2026