The State of Michigan is soliciting qualified contractors to replace the existing water‑softening system at the Lakeland Correctional Facility and to install an additional reverse‑osmosis system in the power‑plant basement. The work includes demolition of the current softener, supply and installation of new softening equipment, addition of a reverse‑osmosis unit, associated plumbing, electrical, and control work, as well as related site preparation, testing, and commissioning. The contract calls for a substantial‑completion period of 36 weeks from notice to proceed, with performance and payment bonds required for bids over $50,000 and a 5 % bid guarantee. The project budget is indicated by an allowance of $100,000, and bidders must submit electronically via the SIGMA VSS system.
• Replace existing water‑softening system
• Install new reverse‑osmosis system in power‑plant basement
• Provide all plumbing, electrical, and control work required for the systems
• Perform demolition, site preparation, testing, and commissioning
• Submit electronic bid with required bonds and 5 % guarantee
• Substantial completion required within 36 weeks (252 days)
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.