Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Utah guideUtah Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Utah
  4. ›Closed bids
  5. ›Pepperwood Booster Station Site Plan

City of Sandy·Utah

Pepperwood Booster Station Site Plan

Closes 9/22/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Sandy, Utah is seeking qualified contractors to supply, install, and commission backup power generators (minimum 500 kW) at the Pepperwood Booster Station site, along with associated civil work such as concrete retaining walls of at least 10 ft height. Bidders must submit a Statement of Qualifications detailing corporate structure, licensing, diverse‑business certifications, safety performance, financial stability, surety and insurance information, and prior experience on similar projects. The solicitation includes a pre‑bid meeting on 17 Sep 2026, a question cut‑off on 18 Sep 2026, and a bid submission deadline on 22 Sep 2026. The contract will likely involve general‑contracting responsibilities, sub‑contracting of electrical work, and coordination with city‑pre‑purchased generators. • Scope: Supply and install stationary packaged generators (≥500 kW) and related civil infrastructure. • Required qualifications: corporate/LLC/JV documentation, licensing, safety and insurance certificates, financial statements, past project references (concrete retaining walls & generator installs). • Mandatory pre‑bid meeting (informational only). • Submission format: electronic bid via Teams, with required attachments (Schedules A & B, certifications, resumes). • Evaluation based on experience, financial strength, safety record, and compliance with city requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Georgia Keyser(Purchasing Agent)

[email protected]

Key dates

Opened
9/8/2026
Questions due
9/18/2026
Pre-bid meeting
9/17/2026
Closes
9/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
25-70- - Public Works Addendum 1

Budget estimate

$500,000 – $2,000,000

The solicitation does not disclose a contract value. Based on typical costs for 500 kW standby generator packages (approximately $150,000–$300,000 each) plus civil site preparation, concrete retaining walls, permitting, and contingency, a reasonable estimate for the total award is between $500,000 and $2,000,000. Larger generators or extensive civil work could push the high end toward $3 M, while a minimal scope could be nearer the low end.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Palm Beach County Department of Airports·Florida

Top match · 62%

LNA Southside Redevelopment Program Phase 3

Closes 10/20/2026Opened 9/22/2026

The Ride Solution·Florida

61% match

BUS DEPOT IMPROVEMENT - CONSTRUCTION PHASE

Closes 11/6/2026Opened 8/26/2026

Palm Beach County Department of Airports·Florida

61% match

LNA Southside Redevelopment Program Phase 3

Closes 10/20/2026Opened 10/2/2026

City of Austin·Texas

61% match

Gregg Manor Subdivision Lift Station (SER-5219R2)

Rolling / TBD closeOpened 8/3/2026

National Park Service·United States of America

60% match

National Park Service Request for Proposals (RFP) for Caneel Bay Property

Rolling / TBD closeOpened 5/8/2026

Town of Jupiter·Florida

60% match

Jupiter Community Park Restrooms, Utility Building, and Island Way Wellfield Improvements (W2109A&B)

Closes 10/13/2026Opened 9/1/2026

NYS Ulster County·New York

60% match

ROSENDALE PUBLIC SAFETY RADIO TOWER SITE PROJECT

Closes 10/22/2026Opened 9/24/2026

Napa Valley Transportation Authority·California

60% match

South Napa County Station Area Plan

Closes 11/6/2026Opened 10/6/2026

National Park Service·United States of America

60% match

National Park Service Request for Proposals (RFP) for Caneel Bay Property (CLOSED)

Rolling / TBD closeOpened 8/12/2026

Pinellas County·Florida

60% match

Gulf Beach Water Booster Station Improvements (PID 002150A)

Closes 10/20/2026Opened 10/2/2026

City of Charlotte·North Carolina

60% match

Hambright Park and Ride Construction Project

Rolling / TBD closeOpened 5/5/2026

Urban Redevelopment Authority of Pittsburgh·Pennsylvania

60% match

Pittsburgh Technology Center Parcel 29-B-315 - Rolling RFP

Rolling / TBD closeOpened 6/17/2026

Palm Beach County Department of Airports·Florida

59% match

LNA Southside Redevelopment Program Phase 3

Closes 10/20/2026Opened 10/6/2026

Urban Redevelopment Authority of Pittsburgh·Pennsylvania

59% match

Pittsburgh Technology Center Parcel 11-S-44 - Rolling RFP

Rolling / TBD closeOpened 6/17/2026

City of Indianapolis·Indiana

59% match

834 E. Westfield Blvd – Former IFD Station 32

Closes 10/30/2026Opened 8/22/2026

Georgia Butts County Board of Commissioners·Georgia

59% match

RFP #27-02 DUAL-LIFT 911 DISPATCH CONSOLES

Closes 11/19/2026Opened 10/2/2026

Village of Estero·Florida

59% match

Village Center Hub P3 Opportunities

Closes 12/15/2026Opened 9/15/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

59% match

Avondale South Lift Station Generator & Avondale North Lift Station

Closes 11/19/2026Opened 10/7/2026

U.S. Department Of Defense·Wyoming

59% match

PKA Relocatable Facility

Closes 12/12/2026Opened 12/4/2025

City of Wildwood·Missouri

59% match

TAP-5500(692) Green Pines Park Connector Path

Closes 10/14/2026Opened 9/15/2026

City of Indianapolis·Indiana

59% match

834 E. Westfield Blvd – Former IFD Station 32

Closes 10/30/2026Opened 7/29/2026

U.S. Department Of Defense·California

59% match

P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine Corps Air Station Miramar, San Diego, California

Closes 10/14/2026Opened 9/15/2026

San Gabriel Unified School District·California

59% match

2026-Bid-SG-03 Gabrielino HS Gym demo-Site Plan - Utilities Demo

Rolling / TBD closeOpened 8/4/2026

Town of Williamston·South Carolina

59% match

Brookdale Park Recreation Field Lighting

Closes 10/15/2026Opened 8/18/2026

Maryland DoIT - Dept Of Information Technology - Administration·Maryland

58% match

FC0003413 Site #338 – FA4 LEO-DNR – Smallwood State Park Concessions

Closes 10/15/2026Opened 9/23/2026