The Department of State Hospitals (DSH) in Patton, CA is seeking a qualified contractor to provide comprehensive underground storage‑tank (UST) maintenance, testing, repair, and compliance services for its campus. The contract runs from July 1 2027 through June 30 2029 and requires a prime contractor (no subcontractors) to perform routine inspections, annual testing, fuel quality analysis, spill‑bucket replacement, hose and monitoring‑system repairs, and associated safety, environmental, and reporting duties. All work must comply with state and federal regulations, include robust data‑privacy safeguards, and meet strict hospital security protocols.
• Monthly inspections of each UST, annual vapor‑recovery, secondary‑containment, and monitoring‑system testing.
• Repair/replacement of spill buckets, hoses, sensors, and over‑fill prevention devices; provision of hazardous‑material spill kits and staff training.
• Detailed service reports, “as‑built” drawings, and compliance documentation; mandatory attendance at an on‑site bidder conference.
• Requires California Class A General Engineering Contractor license with hazardous‑materials endorsement, DIR registration, prevailing‑wage compliance, extensive insurance/bonding, and strict background‑screening.