This solicitation seeks a qualified contractor to upgrade existing solar service points along Wyoming Highway 28 to AC power. The work includes removal of existing solar equipment, installation of pull boxes, conductors, UPS systems, batteries, AC‑DC converters, power supplies, PDUs, breaker panels, and associated wiring in compliance with NEC and agency specifications. The contractor must also perform boring at two mileposts, provide all required materials, label all cables, protect against rodents and insects, and install surge suppression devices. Payment is made upon satisfactory completion and acceptance of the work.
• Scope: Electrical installation and conversion of solar service points to AC power at two locations (MP 62.46 and MP 62.30).
• Required deliverables: Pull boxes, conductors, UPS, batteries, Meanwell 12 V/10 A power supplies, AC‑DC converters, Synaccess PDUs, breaker panels, labeling, surge protection, and site cleanup.
• Mandatory pre‑bid virtual conference on September 1, 2026 (attendance required).
• Bid submission deadline: September 15, 2026, 1:00 PM EDT (electronic).
• Location: WYDOT ITS Program, Cheyenne, WY (project sites on WY‑28).
• Contractor responsible for all labor, materials, and bore‑hole work.