Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Closed bids
  5. ›CONNER COMPLEX NEW LABORATORY FACILITY Architect & Engineering Serv…

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

CONNER COMPLEX NEW LABORATORY FACILITY Architect & Engineering Services

Closes 8/5/2026$2.5M – $10MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Florida Department of Agriculture and Consumer Services is seeking a qualified Architect-Engineer firm to provide professional design services for a new multi-discipline government laboratory facility located at the Conner Complex in Tallahassee, Florida. The selected firm will be responsible for planning, programming, design, and construction of the new laboratory, which will house five department scientific divisions and provide an optimal physical environment to support critical mission objectives. The firm will also provide construction administration services during the construction phase. The project will be delivered using a construction management at-risk, negotiated fee-guaranteed maximum price construction contracting method. • The new laboratory facility will be approximately 156,000 square feet and will include dedicated labs, BSL-2 and BSL-3 capable, offices, storage, shared services, and loading/receiving areas. • The facility will provide space for the consolidation of campus laboratory operations and the relocation of multiple offices within the complex, including administrative staff, warehouse distribution/receiving, and various maintenance operations. • The selected firm will be required to have relevant experience with laboratory/office design and construction, as well as government facilities and new commercial construction projects of similar size. • The firm will be evaluated based on their key personnel and relevant design experience, ability to perform contract delivery, and understanding of program and project requirements. • The project is subject to future legislative appropriation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michelle O. Faircloth(Procurement Officer)

[email protected]

(850) 617-7028

Key dates

Opened
7/1/2026
Questions due
7/14/2026
Closes
8/5/2026

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541310
Solicitation №
SOQ DOA 26 27 26

Budget estimate

$2,500,000 – $10,000,000

Based on the project description, the estimated budget for this opportunity can be inferred from the construction value of similar laboratory facilities. A rough estimate for the construction cost of a 156,000 square foot laboratory facility could be in the range of $50 million to $100 million. The Architect-Engineer's fee for a project of this size could be in the range of 5% to 10% of the construction cost, which would put the fee in the range of $2.5 million to $10 million. However, this is a rough estimate and the actual budget could be higher or lower depending on the specifics of the project and the contract terms.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

Top match · 80%

CONNER COMPLEX NEW LABORATORY FACILITY

Closes 11/10/2026Opened 10/2/2026

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

73% match

Conner Lab Corridor Structural Improvement - FDACS Project No. 1116

Closes 10/22/2026Opened 9/11/2026

National Aeronautics And Space Administration·Ohio

71% match

Aerospace Power Systems Laboratory (APSL) Facility

Closes 10/30/2026Opened 7/14/2026

Shawnee State University·Ohio

70% match

Technology Innovation Lab – Kricker Innovation Hub

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·Nebraska

69% match

Repair Aeronautics Laboratory - USAFA

Closes 10/23/2026Opened 9/30/2026

The University of North Carolina·North Carolina

69% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

University of Louisville·Kentucky

69% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

U.S. Environmental Protection Agency·Washington

69% match

Z--Laboratory Facility Operation & Maintenance

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Defense·Colorado

69% match

Repair Aeronautics Laboratory - USAFA

Closes 10/23/2026Opened 9/30/2026

Wyoming State Construction Department·Wyoming

68% match

Design/Engineering Services for Western Wyoming Community College Powerline Technology Facility - Rock Springs, WY

Closes 11/3/2026Opened 9/24/2026

Northern Virginia Community College·Virginia

68% match

260-B5260-007 CM Engineering Lab & Pantry

Closes 11/5/2026Opened 10/6/2026

Grayson College·Texas

68% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·Ohio

68% match

Sources Sought for Human Performance Wig Lab at WPAFB

Closes 10/15/2026Opened 9/30/2026

Michigan Airport Community Schools·Michigan

68% match

New Student Activity Center

Closes 10/15/2026Opened 9/22/2026

U.S. Environmental Protection Agency·Kansas

68% match

Z--Laboratory Facility Operation & Maintenance

Closes 10/16/2026Opened 9/30/2026

U.S. Department Of Defense·Mississippi

68% match

Information Technology Laboratory Commercial Solutions Openings (CSO)

Closes 10/30/2027Opened 5/20/2026

U.S. Department Of Defense·New Hampshire

67% match

Commercial Solutions Opening - ERDC Cold Regions Research and Engineering Laboratory

Closes 12/31/2026Opened 1/12/2026

U.S. Department Of Defense·Rhode Island

67% match

P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI

Closes 10/27/2026Opened 10/8/2026

University of Arkansas·Arkansas

67% match

NOTICE TO GENERAL CONTRACTORS

Closes 10/27/2026Opened 10/10/2026

U.S. Department Of Defense·Oklahoma

67% match

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

Closes 10/30/2026Opened 9/4/2026

New Mexico State University·New Mexico

67% match

CMAR 5297 I.D.E.A.L. Research Facility

Closes 11/2/2026Opened 10/9/2026

U.S. Department Of Energy·Colorado

67% match

Design-Build Services – STM Security Fencing - North Boundary

Closes 11/11/2026Opened 10/7/2026

University of Arkansas, Fayetteville·Arkansas

67% match

NOTICE TO ARCHITECTS

Closes 10/27/2026Opened 10/10/2026

U.S. Department Of Defense·Virginia

67% match

P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI

Closes 10/13/2026Opened 5/14/2026

West Virginia University·Virginia

67% match

HSC 3rd Floor STEPS Lab Expansion

Closes 10/15/2026Opened 9/25/2026