The Omaha Public Schools is seeking bids to replace the existing 500‑ton cooling tower at Marrs Middle School. The contractor must demolish the existing tower, remove associated pipework, and install a new cross‑flow, induced‑draft cooling tower with VFD‑controlled fans, new CPVC condenser‑water piping, strainers, and all required mechanical and electrical connections. The scope includes full testing, adjusting, balancing, commissioning, training of OPS maintenance staff, provision of O&M manuals, record drawings, and a one‑year warranty on workmanship plus a five‑year warranty on the tower itself.
• Demolition of existing tower, removal of associated mechanical/electrical components.
• Installation of new cooling‑tower system (tower, VFD, fan, piping, supports, controls) on existing four‑pier support.
• Complete submittal package: shop drawings, O&M manuals, record drawings, certifications, and warranty documentation.