Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Georgia
  4. ›Construction
  5. ›2025 CDBG- No. 25p-y-095-1-6798

Georgia McIntosh County Board of Commissioners·Georgia

2025 CDBG- No. 25p-y-095-1-6798

Closes 12/1/2026$1.5M – $3MInvitation for Bid
Get bids like this by emailBid source

Description

The McIntosh County Board of Commissioners is seeking sealed bids for the 2025 Community Development Block Grant (CDBG) water system improvements project. The scope includes installing approximately 8,956 linear feet of 6‑inch Class 150 PVC water main, seven mechanical‑joint ductile‑iron gate valves, twelve three‑way fire hydrants, two connections to existing mains, removal and replacement of about 40 square yards of Class A pavement, a new 5,000‑gallon hydropneumatic tank, erosion control measures, and all necessary appurtenances. Bidders must submit sealed bids by 1:00 PM on December 1, 2026, provide a 10 % bid bond, and complete the work within 60 consecutive calendar days after receiving a notice to proceed. The contract is subject to HUD Section 3, Build America/Buy America requirements, and includes mandatory Section 3 documentation prior to award. • Project location: Darien, McIntosh County, GA • Total linear footage of water main: ~8,956 LF (6”) • Additional components: 7 gate valves, 12 fire hydrants, 2 existing‑main connections, 5,000‑gal tank, 40 SY pavement work, erosion control • Bid submission deadline: Dec 1, 2026 1:00 PM ET (sealed bids) • Performance period: 60 calendar days from notice to proceed • Required bonds: 10 % bid bond; payment, performance, and insurance bonds after award • Compliance: HUD Section 3, Build America/Buy America, equal opportunity provisions • Contact: JamieLynn Harris (buyer contact) – [email protected] – (478) 757‑1169

Attached files

Contact

JamieLynn Harris(Buyer Contact)

[email protected]

(478) 757-1169

Key dates

Opened
10/28/2026
Closes
12/1/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
25P-Y-095-1-6798

Budget estimate

$1,500,000 – $3,000,000

Based on typical costs for municipal water main installations—approximately $150‑$200 per linear foot for 6‑inch PVC, plus valves, hydrants, tank, pavement work, and overhead—total contract value is estimated between $1.5 million and $3 million. The lower bound assumes modest unit costs and minimal contingencies; the upper bound reflects higher material prices, extensive site work, and required compliance documentation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Millen·Georgia

Top match · 86%

2025 Millen CDBG (PE24101)

Closes 11/3/2026Opened 9/29/2026

Georgia City of Eatonton·Georgia

85% match

2025 CDBG- No. 25p-x-117-2-6787

Closes 12/2/2026Opened 10/28/2026

Georgia Dodge County Board of Commissioners·Georgia

85% match

2027 CDBG Streets & Drainage - Dodge County

Closes 11/10/2026Opened 10/2/2026

Georgia Ware County Board of Commissioners·Georgia

85% match

Ware County CDBG FY 26 Street and Drainage Iimprovements

Closes 11/23/2026Opened 10/15/2026

Henry County·Georgia

83% match

(BID) 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

Georgia Fayette County Board of Commissioners (Purchasing Department)·Georgia

83% match

27043-B: Lake McIntosh Dam Structural Repairs

Closes 11/19/2026Opened 10/13/2026

Georgia Coffee County Board of Commissioners·Georgia

83% match

Coffee County CDBG FY25 Street and Drainage Improvements

Closes 11/18/2026Opened 10/9/2026

Georgia Bryan County Board of Commissioners·Georgia

82% match

CDBG and CHIP GRANT WRITING/ADMINISTRATIVE and RELATED GRANT SERVICES � STATE AND FEDERAL PROJECTS

Closes 11/16/2026Opened 10/15/2026

Georgia Bartow County Government·Georgia

81% match

RFB-26-55-05 BCW Cassville White Road Ph2 Widening and Sewer Relocation

Closes 11/10/2026Opened 10/8/2026

Georgia Henry County Board of Commissioners·Georgia

81% match

BID, 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

Georgia City of Cartersville·Georgia

81% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Maryland Frederick County Government·Maryland

81% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

Middle Georgia Regional Commission·Georgia

81% match

2027 Town of Danville CDBG

Closes 11/23/2026Opened 10/20/2026

Georgia Fulton County Purchasing Department·Georgia

81% match

26ITB153285856K-DB Bethany Tank Rehabilitation & Coating

Closes 11/18/2026Opened 10/21/2026

St. Helena Parish Police Jury·Louisiana

81% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Georgia Oglethorpe County Board of Commissioners·Georgia

81% match

Oglethorpe County Recreation Irrigation Expansion

Closes 11/2/2026Opened 10/2/2026

Neel-Schaffer, Inc·Mississippi

80% match

NS.20334.000 Sandersville 2026 CDBG Wastewater System Improvements#21116

Closes 11/10/2026Opened 10/15/2026

Maryland Chevy Chase Village·Maryland

80% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

Western Virginia Water Authority·Virginia

80% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Georgia Bleckley County Board of Commissioners·Georgia

80% match

Bleckley 2027 CDBG Health Department Building Improvements

Closes 11/17/2026Opened 10/13/2026

Georgia Gwinnett County·Georgia

80% match

BL155-26, Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Georgia Pike County Water & Sewerage Authority·Georgia

80% match

Filter Backwash Water Treatment

Closes 11/13/2026Opened 10/14/2026

Georgia Gwinnett County Government·Georgia

80% match

BL139-26 Provision of Grounds Maintenance at Department of Water Resources Facilities on an Annual C

Closes 11/2/2026Opened 9/24/2026