Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Michigan
  4. ›See attached

Michigan Cedar Springs Public Schools·Michigan

See attached

Closes 10/26/2026$75k – $150kRequest for Proposal
Get bids like this by emailBid source

Description

The Cedar Springs Public Schools district is seeking qualified contractors to supply, install, and commission a fully equipped greenhouse for its AgScience/FFA program. The greenhouse will be a single‑bay structure placed on an existing 32’ × 60’ concrete slab and must meet all local building codes, including wind and snow loads. The scope includes engineered structural drawings, HVAC (exhaust fans, heating, evaporative cooling, airflow fans), shading, automatic temperature control, grow lights, emergency lighting, fire safety equipment, and optional benching. The contractor must obtain all required permits, provide insurance as specified, and submit a 5 % bid bond (and a 25 % performance/payment bond for proposals ≥ $50,000). The project is scheduled to start on April 1 2027 and be completed by July 31 2027. • Supply and install a single‑bay greenhouse on a 32’ × 60’ slab • Provide engineered structural drawings, permits, and inspections • Install exhaust fans, heating, evaporative cooling, airflow fans, shade system, and automatic temperature control • Provide grow lights, emergency lighting, exit signs, fire extinguishers, and optional benching • Deliver and install shutters, hanging basket rails, and related accessories • Meet Michigan wind and snow load requirements and all applicable codes • Provide required insurance (WC, CGL ≥ $1M, Motor Liability ≥ $1M) and add Cedar Springs as additional insured • Submit 5 % bid bond; performance/payment bond of 25 % for contracts ≥ $50,000 • Project timeline: start April 1 2027, complete no later than July 31 2027

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Matti Sullivan(Chief Financial Officer)

[email protected]

(616) 696-1204

Key dates

Opened
10/12/2026
Pre-bid meeting
10/13/2026
Site visit
10/13/2026
Closes
10/26/2026
Projected award
11/9/2026
Duration
4 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238990
Solicitation №
RFP-CSP-270000000083-1

Budget estimate

$75,000 – $150,000

The document does not disclose a contract value. A 32 × 60 ft commercial greenhouse typically costs between $25 and $50 per square foot for the structure and basic systems, yielding a base range of $48,000–$96,000. Adding HVAC, lighting, shading, fire safety, and optional benching can increase the total to roughly $75,000–$150,000. Therefore, a reasonable estimate for the contractor’s earnings is $75k to $150k, depending on equipment selections and finish levels.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texas A&M AgriLife Research·Texas

Top match · 85%

Construction of CEA Research Greenhouse in Dallas, TX

Closes 10/16/2026Opened 9/16/2026

Michigan Greenville Public Schools·Michigan

84% match

Cedar Crest Elementary HVAC Upgrades

Closes 10/27/2026Opened 10/7/2026

Texas A&M AgriLife Research·Texas

84% match

Construction of CEA Research Greenhouse in Dallas, TX

Closes 10/16/2026Opened 9/16/2026

Michigan Forest Hills Public Schools·Michigan

83% match

RFP-Thornapple Elementary Mechanical Improvements

Closes 11/3/2026Opened 10/5/2026

Lynwood Unified School District·California

83% match

Lynwood High School Bullis HVAC Replacement Project – Owner‑Furnished, Contractor‑Installed HVAC Units

Closes 10/20/2026Opened 9/17/2026

Harmony Public Schools·Texas

82% match

Houston District Canopies

Closes 10/20/2026Opened 9/3/2026

Detroit Public Schools Community District - Procurement Department·Michigan

82% match

Owner’s Representative – Air Conditioning Program

Closes 10/20/2026Opened 10/6/2026

Lynwood Unified School District·California

82% match

Lynwood High School – Bullis Campus HVAC Units Replacement Project

Closes 10/20/2026Opened 9/17/2026

Harmony Public Schools·Texas

82% match

Houston District Canopies

Closes 10/20/2026Opened 9/3/2026

City of Cedar Rapids·Iowa

82% match

Install New Roof Curbs on 4 City Facilities

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Agriculture·Montana

82% match

GAOA Star Meadows MEP Repairs Utility Installations Flathead NF

Closes 12/8/2026Opened 10/1/2026

U.S. Department Of Agriculture·District of Columbia

82% match

CAS Education Heat Pump

Closes 10/20/2026Opened 10/1/2026

Georgia Douglas County Board of Education·Georgia

81% match

DCSD27-010 Turner Middle School HVAC Modifications and Reroofing

Closes 11/9/2026Opened 10/9/2026

Lynwood Unified School District·California

81% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

Pulaski County Special School District·Arkansas

81% match

Grounds Maintenance

Closes 11/6/2026Opened 9/20/2026

City of Cedar Rapids·Iowa

81% match

FY 2027 Tree & Vegetation Removal Project

Closes 10/21/2026Opened 10/7/2026

San Gabriel Unified School District·California

81% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Georgia Douglas County Board of Education·Georgia

81% match

DCSD27-009 Dorsett Shoals Elementary School HVAC & Reroofing

Closes 11/9/2026Opened 10/9/2026

Lynwood Unified School District·California

81% match

Abbott Elementary School HVAC Units Replacement – Owner‑Furnished Contractor‑Installed HVAC Units

Closes 11/4/2026Opened 10/1/2026

U.S. Department Of Agriculture·Arkansas

81% match

CAS Education Heat Pump

Closes 10/20/2026Opened 10/1/2026

Greenville County Schools·South Carolina

81% match

Synthetic Turf Installation - Four Sites (Winter 26/27)

Closes 10/16/2026Opened 10/1/2026

Michigan L’Anse Creuse Public Schools Board of Education·Michigan

81% match

Roofing Replacement Bid

Closes 11/5/2026Opened 10/9/2026

University of Southern Mississippi·Mississippi

81% match

Hillcrest Chiller Plant Upgrade

Closes 10/22/2026Opened 9/23/2026

U.S. Department Of Agriculture·District of Columbia

81% match

GAOA Star Meadows MEP Repairs Utility Installations Flathead NF

Closes 12/8/2026Opened 10/1/2026