The U.S. Geological Survey’s EROS Center in Sioux Falls, SD is seeking a small‑business‑qualified firm to remove and replace deteriorated chilled‑water, condenser‑water, and heating‑water branch piping and associated pneumatic controls, and to install electric actuators and updated control sequences. Work must be performed while the data‑center remains operational, with minimal disruption to office and computer‑room functions. The contract is a firm‑fixed‑price, 100 % small‑business set‑aside, with a performance period of roughly eight months.
• Replace and reinstall chilled‑water and condenser‑water piping, including new 2‑way valves, pumps and VFDs.
• Remove pneumatic controls in the 1996 penthouse and install electric actuators compatible with the existing Honeywell BACnet system.
• Provide all required submittals, construction schedule (Gantt chart within 10 days of NTP), punch‑list, and close‑out documentation.
• Comply with federal, state, and local codes; obtain all permits; and meet security‑clearance and building‑pass requirements.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.