Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Montana
  4. ›Closed bids
  5. ›Campus Fire Sprinkler Upgrades - Bitterroot Building

Awarded contract·Architecture & Engineering Division - State of Montana·Montana

Campus Fire Sprinkler Upgrades - Bitterroot Building

Won by Cushing Terrell$1.2MSingle Award
Contract source

Awarded vendors

  • Cushing Terrell

Description

This contract provides architectural and engineering design services for the Montana School for the Deaf & Blind. The work likely includes planning, schematic design, design development, and construction documents for renovations or new construction to improve accessibility and educational spaces. The Montana Department of Administration’s Architecture & Engineering Division issued the solicitation (A/E#: 2022-20-01) and awarded the work to Cushing Terrell, a design consulting firm. Key points include: • Scope covers full‑service design (architectural, engineering, and possibly interior design) for a specialized K‑12 educational facility. • The project is funded by the State of Montana and managed through the A/E Division, ensuring compliance with state construction standards and accessibility requirements. • No public bidding dates, award dates, or contract value were disclosed in the provided documents.

Attached files

Key dates

Bids closed
12/8/2022

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Invitation for Bid
Industry
Architecture
NAICS
541310
Solicitation №
2022-20-01

Contract value

$1,200,000

No explicit dollar value is provided. A design‑services contract for a statewide special‑needs school typically ranges from $800,000 to $2,000,000 depending on project size, complexity, and required engineering coordination. Considering the need for specialized accessibility features and the involvement of a professional design firm, a reasonable midpoint estimate is approximately $1.2 million. This figure assumes a firm‑fixed‑price arrangement covering all design phases and limited consulting support.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

University of Missouri-Columbia·Missouri

Top match · 70%

Various Locations - Fire Sprinkler Trades Blanket (CP270421)

Closes 11/3/2026Opened 9/30/2026

Nevada State Public Works Division·Nevada

70% match

Fire Sprinkler System Installation and Fire Alarm Upgrades, Walker River State Recreation Area (25‑S03‑3 & 25‑S03‑4)

Closes 11/4/2026Opened 9/29/2026

Arlington Housing Authority·Massachusetts

70% match

Fire Alarm and Sprinkler System Upgrade

Closes 10/22/2026Opened 9/16/2026

Tulsa Community College·Oklahoma

69% match

Tulsa Community College West and Southeast Campus Fire Sprinkler System

Closes 10/29/2026Opened 10/4/2026

Massachusetts Department of Developmental Services·Massachusetts

69% match

Sprinkler Upgrade Residential Group Home Taunton

Closes 10/14/2026Opened 9/23/2026

Massachusetts Arlington Housing Authority·Massachusetts

67% match

Fire Alarm and Sprinkler System Upgrade

Closes 10/22/2026Opened 9/10/2026

Massachusetts Lynn Housing Authority & Neighborhood Development·Massachusetts

67% match

Fire Alarm and Sprinkler System Improvements at State Aided Developments

Closes 10/23/2026Opened 9/23/2026

DOC - Architecture and Engineering·Virginia

67% match

Beaumont Correctional Center Sprinkler Replacement

Closes 11/18/2026Opened 10/5/2026

CUNY Baruch College·New York

66% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Massachusetts City of Worcester·Massachusetts

66% match

8819-M7 Sprinkler & Fire Alaram Modifications - Phase II - Union Station / WRA

Closes 10/21/2026Opened 9/23/2026

University of Wisconsin Madison·Wisconsin

65% match

Irrigation System Upgrade for UW-Madison OJ Noer Facility (2027-UWMSN-01431-RFB)

Closes 10/27/2026Opened 10/6/2026

City of Worcester·Massachusetts

65% match

Sprinkler & Fire Alarm Modifications - Phase II - Union Station / WRA

Closes 10/28/2026Opened 9/17/2026

Oregon Health and Science University·Oregon

65% match

Fire Sprinkler System Contractors

Rolling / TBD closeOpened 4/26/2021

San Gabriel Unified School District·California

65% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Arlington County Government·Virginia

64% match

N1490 Fire Station 8 HVAC Replacement

Closes 10/16/2026Opened 9/22/2026

Lynn Housing Authority & Neighborhood Development·Massachusetts

64% match

Fire Alarm and Sprinklers REBID

Closes 10/23/2026Opened 7/29/2026

Vancouver Housing Authority·Washington

64% match

Central Park Place Fire Sprinkler System Repair Re-Release

Closes 10/15/2026Opened 8/24/2026

Town of Groton·Connecticut

64% match

Mt Holyoke College - Geo Hub - 50% CD - BID

Closes 10/23/2026Opened 9/22/2026

University of Missouri-Columbia·Missouri

63% match

Telecom Building - Fire Alarm System Upgrades (CP252751)

Closes 10/29/2026Opened 9/16/2026

U.S. Department Of Defense·Connecticut

63% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/6/2026Opened 9/30/2026

Salisbury University·Maryland

63% match

DISHWASHER REPLACEMENT - COMMONS BUILDING

Closes 10/20/2026Opened 9/15/2026