Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Massachusetts
  4. ›Closed bids
  5. ›Design Services - South Division Firehouse & Emergency Comm. Center…

Awarded contract·City of Worcester·Massachusetts

Design Services - South Division Firehouse & Emergency Comm. Center / DPF

Won by Perkins & Will Architects$2.5MAwarded 7/19/2023Single Award
Contract source

Awarded vendors

  • Perkins & Will Architects

Description

The City of Worcester issued an RFQ (DSB‑2‑W3) for full‑service design of a new South Division Firehouse and an adjacent Emergency Communications Center (~30,000 sf firehouse + ~4,000 sf communications facility) with an estimated construction cost of $30‑$35 million. The scope includes feasibility, schematic, design development, construction documents, bidding assistance, construction administration, and FF&E coordination, plus sustainability goals such as Net‑Zero energy, LEED v4.2 BD +C, and possible renewable energy integration. The City required a multidisciplinary team covering 21 specific consulting disciplines and mandated that a senior team member hold the Massachusetts Certified Public Purchasing Official (MCPPO) certification at submission. The selection process was a public RFQ with a pre‑proposal meeting, submission deadline of May 26 2023, and designer selection on June 23 2023, with the award executed on July 19 2023. Perkins & Will Architects was the winning firm. Key points: • New 30‑K sf firehouse + 4‑K sf 911 communications center, including a 100‑ft communications tower. • Comprehensive design services from feasibility through construction administration, with strong sustainability and accessibility requirements. • Mandatory multidisciplinary consultant team (architecture, civil, structural, MEP, fire‑protection, security, geothermal, etc.). • MCPPO certification required for senior staff; no license tie‑to‑certification. • Awarded to Perkins & Will Architects; contract fee to be negotiated, with no fixed price disclosed.

Attached files

Key dates

Bids closed
5/26/2023
Intent to award
7/19/2023
Awarded
7/19/2023
Contract modified
5/22/2023
Starts
7/19/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Architecture
NAICS
541310
Solicitation №
DSB-2-W3

Contract value

$2,500,000

The RFQ cites an estimated construction cost of $30‑$35 million. Design fees for large public‑sector projects typically range from 3‑8 % of construction cost, depending on scope and negotiation. Assuming a midpoint of 5 %, the designer fee would be roughly $1.5‑$1.75 million. Adding possible reimbursable expenses (printing, travel, subcontractor coordination) could bring the total contract value to approximately $2‑$3 million. Given the lack of a disclosed fee, a conservative ballpark estimate of $2.5 million is reasonable.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Park Ridge·Illinois

Top match · 75%

FIRE STATION 36 ENGINEERING DESIGN SERVICES

Closes 11/5/2026Opened 9/30/2026

City of South San Francisco·California

71% match

Community Civic Campus: Phase 3, Fire Station 63

Closes 11/13/2026Opened 10/12/2026

Colorado Department of Corrections / Facility Management Services·Colorado

70% match

CTF DRDC Fire Protection System Repl IFB1 TBD CMS211157

Closes 11/5/2026Opened 9/22/2026

U.S. Department Of Veterans Affairs·Minnesota

70% match

Intent to Sole Source Fire Suppression and Emergency Response Service

Closes 10/18/2026Opened 10/8/2026

City of Charlotte·North Carolina

70% match

Firehouse 44

Rolling / TBD closeOpened 1/1/2026

U.S. Department Of Defense·Nebraska

70% match

Fire Station, Building 806, Buckley Space Force Base, CO 80011

Closes 10/21/2026Opened 9/30/2026

U.S. Department Of Defense·California

70% match

Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CA

Closes 10/13/2026Opened 10/7/2025

Georgia City of Jesup·Georgia

70% match

Jesup Fire Department Station No. 1

Closes 10/29/2026Opened 10/1/2026

James Island Public Service District·South Carolina

70% match

A/E Services for Fire Station No. 4

Closes 10/27/2026Opened 9/29/2026

City of Harrisonburg·Virginia

70% match

Fire Station #4 Project Request for Qualifications (2027006-FD-DB)

Closes 10/14/2026Opened 8/25/2026

City of South San Francisco·California

69% match

Fire Station 63 - REQUEST FOR PROPOSALS FOR SPECIAL INSPECTION SERVICES

Closes 10/26/2026Opened 10/1/2026

California Department of Corrections and Rehabilitation·California

69% match

C5613691-D - Fire House Fleet Maintenance and Repair Services

Closes 12/1/2026Opened 10/12/2026

U.S. Department Of Defense·California

69% match

Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CA

Closes 10/13/2026Opened 9/29/2026

Town of Moncks Corner·South Carolina

69% match

Fire Station 3 - Architectural Services

Closes 10/16/2026Opened 9/18/2026

Teton County·Wyoming

68% match

Request for Qualifications: Architectural Design Services – Jackson Hole Fire & EMS - Fire Station Eight

Closes 11/6/2026Opened 10/12/2026

Massachusetts Department of Fire Services·Massachusetts

68% match

DFSJW RFR - 2027 Fire Extinguisher Filling Station parts, equipment and service

Closes 10/29/2026Opened 10/8/2026

City of Sandy·Utah

68% match

Fire Department Emergency Response Cost Recovery

Closes 10/16/2026Opened 10/2/2026

State University of New York (SUNY)·New York

68% match

Statler Commissary Replace Windows, Loading Dock Doors and Upgrade HVAC in Kitchen 120

Closes 10/20/2026Opened 9/28/2026

City of Montpelier·Vermont

68% match

CITY HALL, FIRE DEPARTMENT, & POLICE STATION FLOOD RECONSTRUCTION AND MITIGATION ARCHITECTURAL AND E

Closes 10/23/2026Opened 9/18/2026

California Department of Corrections and Rehabilitation·California

68% match

C5612706-D, Rebid 6 - Fire Suppression System Services

Closes 10/14/2026Opened 9/10/2026

City and County of San Francisco·California

68% match

EXT DPW | SFFD DOT Project - CM/GC: Trade Package

Closes 7/7/2028Opened 7/7/2025

University at Buffalo·New York

68% match

Statler Commissary Windows, Loading Dock Doors and Kitchen 120 HVAC Upgrade

Closes 10/20/2026Opened 9/28/2026

City of Columbus·Ohio

68% match

FIRE ALARM OFFICE RENOVATION

Closes 10/30/2026Opened 9/30/2026

Gilbert·Arizona

68% match

MF2553/MF2557 - South Area Service Center (SASC) and North Area Service Center (NASC) Master Plans

Closes 10/19/2026Opened 9/16/2026

Iowa Department of Administrative Services·Iowa

68% match

Fire Panel Systems

Closes 11/3/2026Opened 10/2/2026