Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arizona
  4. ›Closed bids
  5. ›Electric Substation Infrastructure Work

Awarded contract·City of Mesa·Arizona

Electric Substation Infrastructure Work

Won by Reinhausen Manufacturing Inc.$1MSingle Award
Contract source

Awarded vendors

  • Reinhausen Manufacturing Inc.

Description

The City of Mesa plans to award a contract for electric substation infrastructure work to Reinhausen Manufacturing Inc. on a sole‑source basis, with a ceiling of up to $1 million per year. The solicitation does not provide detailed technical specifications, but the scope likely includes design, installation, and related services for electrical substation upgrades or new construction. A seven‑day protest period ends on June 16 2026; if no competing vendor responds, the award proceeds. This opportunity is valuable for firms specializing in high‑voltage electrical infrastructure and can represent a sizable annual revenue stream. • Sole‑source award to Reinhausen Manufacturing Inc. • Contract ceiling: not to exceed $1 M annually • Response deadline for competing vendors: June 16 2026 • Work location: City of Mesa, AZ (specific sites not detailed)

Attached files

Key dates

Bids closed
6/9/2026
Duration
1 year

Last updated

Details

Award type
Single Award
Procurement
Sole Source
Industry
Energy and Utilities
NAICS
237130
Solicitation №
RFP-F300-2026166-1

Contract value

$1,000,000

The NOITA explicitly states the contract will be “not to exceed $1,000,000.00 annually.” Because no further breakdown of phases or periods is provided, the best estimate of the contract’s monetary value is the ceiling amount of $1 million per year. If the contract runs for a single year, the total value is $1 M; if it is renewed for additional years, the cumulative value would increase proportionally. No other cost drivers are mentioned, so the $1 M ceiling serves as the primary valuation metric.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Gallup·New Mexico

Top match · 70%

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/5/2026Opened 7/24/2026

Lee County Electrical Cooperative·Florida

69% match

North Lehigh Substation Underground Construction

Closes 10/23/2026Opened 9/4/2026

Iowa State University·Iowa

69% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

City of Piqua·Ohio

69% match

24-17.10 Electrical Construction Piqua 69kV The Site Substation

Closes 10/22/2026Opened 9/8/2026

U.S. Department Of Energy·New York

67% match

Building 510 Substation Upgrade - Phase I

Closes 10/23/2026Opened 10/12/2026

Lee County Electrical Cooperative·Florida

67% match

North Trails Substation Underground Construction

Closes 10/23/2026Opened 9/4/2026

City of Lodi·California

66% match

Guild 230/60 kV Substation Project

Closes 10/23/2026Opened 9/1/2026

Grand River Dam Authority - GRDA·Oklahoma

66% match

RFI 2026-001P-Substation Construction Services

Closes 10/20/2026Opened 9/24/2026

Jea·Florida

66% match

1412223678 (RFP) Circuit 680 UG Cable Replacement Construction Services

Closes 10/27/2026Opened 9/24/2026

City of Springfield·Illinois

65% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

65% match

40th Street Substation Build – GC/EC/MC

Closes 10/15/2026Opened 9/17/2026

Radford University·Virginia

65% match

IFB - IMPROVE CAMPUS UTILITIES INFRASTRUCTURE - ELECTRICAL

Closes 10/15/2026Opened 9/15/2026

California Department of Forestry and Fire Protection·California

64% match

IFB 9CA07882 - Underground Electrical Power Infrastructure Installation

Closes 10/21/2026Opened 9/16/2026

Grand River Dam Authority·Oklahoma

64% match

RFI 2026-001P – Substation Construction Services

Closes 10/20/2026Opened 9/26/2026

City of Albany·Georgia

64% match

Viper Automatic Switch Installation Phase 2 - Substation #2,3,5,10 & 14

Closes 10/14/2026Opened 9/14/2026

City of Piqua·Ohio

64% match

City of Piqua 69 kV “The Site” Substation – Control Building and Relay Panels (Project 24‑17.9A)

Closes 10/21/2026Opened 9/8/2026

Fort Pierce Utilities Authority·Florida

64% match

Totten Substation TT3 Site Construction and Installation

Closes 10/22/2026Opened 9/18/2026

North Carolina City of Rocky Mount·North Carolina

64% match

Substation 10 Transformer Upgrade Re-Bid

Closes 10/14/2026Opened 10/5/2026

Connecticut City of Norwalk·Connecticut

64% match

Norwalk City Hall EV Station Project

Closes 10/27/2026Opened 10/13/2026

City of Springfield·Illinois

64% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

State Fiscal Accountability Authority·South Carolina

64% match

IDQ - Electrical Engineering Services

Closes 10/29/2026Opened 10/6/2026

Maryland Transit Administration·Maryland

63% match

Metro Traction Power Substation Emergency Trip Stations (TPSS ETS) Installation at Various Locations [T-1564-0150]

Closes 11/19/2026Opened 10/1/2026

NYS MTA - Metro-North Railroad·New York

63% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

City of Piqua·Ohio

63% match

CITY OF PIQUA OHIO - Electrical Construction - Piqua 69kV The Site Substation

Closes 10/22/2026Opened 9/8/2026

City of Piqua·Ohio

63% match

Steel Structures – Piqua 69 kV The Site Substation & Washington Road 69 kV Transmission Line

Closes 10/21/2026Opened 9/8/2026