The Columbia Public School District awarded a contract (RFP 25/17) to Professional Contractors & Engineers for the design, construction, and installation of a complete piano laboratory at Rock Bridge High School. The base scope includes structural, electrical, acoustic, and finish work to create a functional piano lab, with two optional add‑ons: electrical poles ($4,210) and piano‑moving dollies ($12,944). The total awarded value totals approximately $92,583. The project is a modest‑size public‑school construction effort located in Columbia, Missouri.
• Scope: Full build‑out of a piano lab (construction, electrical, acoustic, finishing).
• Financials: Base bid $75,429; optional poles $4,210; optional dollies $12,944; total ≈ $92,583.