This contract covers the design‑build construction of Oakwood Avenue Phase 1, encompassing extensive water and sewer infrastructure improvements in West Hartford, CT. The work includes 8,230 ft of sanitary sewer main cleaning, CCTV inspection, and CIPP lining; 1,250 ft of sanitary sewer lateral removal and replacement; replacement of 45 sewer frames and covers; installation of 2,820 ft of new water main and related accessories; and renewal of 68 water services. The project also requires full restoration of roadway, sidewalks, curbing, lawns, and driveway aprons after construction. Bidders must hold a current DAS Contractor Pre‑qualification Certificate and provide a 10 % bid security. A mandatory pre‑bid conference was held on 28 Feb 2020, and questions were accepted through 5 Mar 2020.
• Scope: Sewer line cleaning, CCTV, CIPP lining, lateral replacement, water main installation, and related civil works.
• Location: Town of West Hartford, Connecticut.
• Requirements: DAS pre‑qualification, 10 % bid security, mandatory pre‑bid conference attendance.
Attached files
The award documents live at the source — open the contract source above to download them.