Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Closed bids
  5. ›Oakwood Avenue - Phase 1 Water & Sewer Improvements (11% SBE)

Awarded contract·The Metropolitan District·Connecticut

Oakwood Avenue - Phase 1 Water & Sewer Improvements (11% SBE)

$5MAwarded 6/1/2020Single Award
Contract source

Description

This contract covers the design‑build construction of Oakwood Avenue Phase 1, encompassing extensive water and sewer infrastructure improvements in West Hartford, CT. The work includes 8,230 ft of sanitary sewer main cleaning, CCTV inspection, and CIPP lining; 1,250 ft of sanitary sewer lateral removal and replacement; replacement of 45 sewer frames and covers; installation of 2,820 ft of new water main and related accessories; and renewal of 68 water services. The project also requires full restoration of roadway, sidewalks, curbing, lawns, and driveway aprons after construction. Bidders must hold a current DAS Contractor Pre‑qualification Certificate and provide a 10 % bid security. A mandatory pre‑bid conference was held on 28 Feb 2020, and questions were accepted through 5 Mar 2020. • Scope: Sewer line cleaning, CCTV, CIPP lining, lateral replacement, water main installation, and related civil works. • Location: Town of West Hartford, Connecticut. • Requirements: DAS pre‑qualification, 10 % bid security, mandatory pre‑bid conference attendance.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
3/19/2020
Intent to award
6/1/2020
Awarded
6/1/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
2020B-07

Set-asides

Small Business, Partial Set-Aside

Contract value

$5,000,000

No explicit contract value is provided. Based on the extensive scope—several thousand linear feet of sewer cleaning, CIPP lining, lateral replacement, plus nearly three thousand feet of new water main, plus associated civil restoration—similar municipal water‑sewer rehabilitation projects in Connecticut typically range from $3 million to $7 million. Assuming average unit costs of $300‑$400 per linear foot for CIPP lining and $200‑$250 per foot for new water main, plus a $1.5‑$2 million lump sum for civil restoration, a reasonable ballpark estimate is roughly $5 million. This estimate accounts for labor, materials, equipment, permits, and contingency.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Eatonville·Florida

Top match · 72%

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Broken Arrow·Oklahoma

71% match

Oak Creek South Concrete Street Rehabilitation

Closes 10/27/2026Opened 9/29/2026

City of Charlotte·North Carolina

71% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Farmers Branch·Texas

71% match

2026 Water and Wastewater - Capital Improvements Plan - Phase #1

Closes 10/29/2026Opened 10/7/2026

Western Virginia Water Authority·Virginia

71% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

71% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

Western Virginia Water Authority·Virginia

70% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Woodland·California

70% match

Lemen Avenue Utility Improvements Project

Closes 10/13/2026Opened 9/23/2026

Pinellas County·Florida

70% match

Ridgewood Estates Sewer Improvements Project and 82nd Avenue & 113th Street Water Main Improvements Project (PID 003204I & PID 006170A)

Closes 10/13/2026Opened 10/2/2026

Hastings Utilities·Nebraska

69% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Hudson, OH·Ohio

69% match

258 N. Main Street Storm Sewer Improvements

Closes 10/20/2026Opened 9/27/2026

Moore & Bruggink, Inc·Michigan

69% match

East River Street Improvements – Spring Lake

Closes 10/28/2026Opened 9/30/2026

City of York·Nebraska

69% match

York, NE, York Industrial Subdivision - Infrastructure Improvements, one half mile West of N Division Ave, North of West 25th Street, York, NE - 2026

Closes 10/27/2026Opened 10/7/2026

City of Anderson·South Carolina

69% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

City of Fort Myers·Florida

69% match

Michigan Avenue Utility Improvement Project

Closes 10/26/2026Opened 9/24/2026

City of Hastings Public Works / Utilities·Nebraska

69% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

New York City Department of Environmental Protection·New York

68% match

82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF

Closes 11/18/2026Opened 10/7/2026

Spartanburg Water·South Carolina

68% match

Rickert Avenue Waterline Improvements Project

Closes 10/13/2026Opened 9/14/2026

Missouri Department of Transportation·Missouri

68% match

SL District, City of Kirkwood, South Clay Avenue Resurfacing Project

Closes 10/13/2026Opened 9/17/2026

City of Charlotte·North Carolina

68% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

Long Beach Utilities Department·California

68% match

Cherry Avenue Sewer Improvement Project (SC-0512)

Closes 10/14/2026Opened 9/18/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Elgin·Illinois

68% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

Brazos Valley·Texas

68% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Sterling Heights·Michigan

68% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 10/13/2026Opened 9/30/2026