This contract is a lump‑sum construction award for the renovation of the third‑floor dance studios in Wayne State University’s historic Old Main building. The scope includes demolition of existing sub‑floors, installation of a new sub‑floor system, placement of a shock‑pad system, and the finishing of two studios with different flooring materials (strip‑maple hardwood in Studio 3372 and commercial dance vinyl in Studio 3374), together with vented base and transition strips. The work must comply with WSU wage‑rate requirements, certified‑payroll reporting, smoke‑free policies, and all applicable safety and environmental standards. The project is awarded to Shock Brothers, with a bid deadline of 6 Dec 2023 and a required substantial completion date of 30 Dec 2023.
• Demolition of existing sub‑floor and flooring in two studios (≈ 2,270 sf and 1,500 sf).
• Installation of site‑built plywood sub‑floor, Robbins EDPM Rubber‑Bio‑Pad, and specified finish flooring (hardwood strip maple & Harlequin dance vinyl).
• Full compliance with WSU wage schedule, certification payroll, insurance, bonding (if contract > $50k) and smoke‑free campus policies.