Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Closed bids
  5. ›Design-Build Contractor For ECR Clarifiers 1 & 2 Rehabilitation

Awarded contract·City of West Palm Beach·Florida

Design-Build Contractor For ECR Clarifiers 1 & 2 Rehabilitation

Won by Globaltech, Inc.$7.5MSingle Award
Contract source

Awarded vendors

  • Globaltech, Inc.

Description

The City of West Palm Beach, acting as the agent for the East Central Regional Wastewater Facilities Operations Board, awarded a design‑build contract to rehabilitate Clarifiers 1 and 2 at the East Central Regional Wastewater Treatment Facility in West Palm Beach, FL. The award went to Globaltech, Inc., a private firm tasked with preparing permits, construction drawings, specifications, and completing the full rehabilitation of the two clarifier units. The solicitation was open to qualified design‑build firms, with a proposal deadline of 3:00 PM on April 1, 2026, and included a non‑mandatory pre‑proposal conference on February 25, 2026. The contract is a single‑award, firm‑fixed‑price arrangement and falls under the City’s standard procurement process. • Scope: Permit acquisition, detailed design, construction documents, and complete rehabilitation of two wastewater clarifiers. • Procurement: Open RFP (Full and Open Competition), awarded to Globaltech, Inc. • Timeline: Proposal submission closed April 1, 2026; work commencement date not disclosed.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
4/1/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
541330
Solicitation №
RFP 25-26-209 DL

Contract value

$7,500,000

The solicitation does not disclose a contract dollar amount. A full design‑build rehabilitation of two wastewater clarifiers typically involves extensive civil, structural, and mechanical work, permitting, and detailed engineering. Comparable municipal wastewater clarifier projects range from $3 million to $10 million depending on scope, site conditions, and equipment upgrades. Considering the project includes both design and construction phases for two units at a major regional treatment plant, a reasonable midpoint estimate would be roughly $7.5 million. This estimate assumes moderate complexity, standard equipment replacement, and typical labor rates for South‑Florida construction.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Western Municipal Water District·California

Top match · 74%

WRCRWA Primary Clarifier #2 Rehabilitation

Closes 10/26/2026Opened 9/24/2026

Georgia City of Rome·Georgia

73% match

026-26 Rome Water Reclamation Facility � Rehabilitation of Secondary Clarifiers � Design Build

Closes 11/3/2026Opened 9/17/2026

New York City Department of Environmental Protection·New York

73% match

82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF

Closes 11/18/2026Opened 10/7/2026

City of Santa Rosa·California

73% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 10/27/2026Opened 9/29/2026

U.S. Department Of Defense·Texas

72% match

Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX

Closes 10/22/2026Opened 10/7/2026

Los Angeles County Office of Education·California

72% match

EC-ECW Wellness Path Project

Closes 10/16/2026Opened 9/17/2026

City of Rosenberg·Texas

72% match

Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation

Closes 10/15/2026Opened 9/21/2026

City of Vancouver·British Columbia

71% match

Consultant for the Granville Bridge South Ramps Rehabilitation Phase 2

Closes 10/27/2026Opened 9/28/2026

U.S. Department Of Defense·Maryland

71% match

USACE Baltimore District - Emergency Contractor Call List

Closes 4/28/2036Opened 4/28/2026

West Basin Municipal Water District·California

71% match

RFP-DS-0147 Server Room Construction at ECLWRF

Closes 10/15/2026Opened 9/25/2026

Housing Authority of the City of Camden·New Jersey

70% match

I.D.I.Q. Unit Rehabilitation Services

Closes 10/14/2026Opened 10/7/2026

Oregon Clackamas County·Oregon

70% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/10/2026Opened 10/7/2026

New York City Department of Design and Construction·New York

70% match

CONSTRUCTION SERVICES FOR PROPOSED EAST SIDE COAST RESILIENCY PROJECT (ESCR)

Rolling / TBD closeOpened 6/7/2019

U.S. Department Of Veterans Affairs·Texas

70% match

C1DA--674-19-101 Replace Boilers and Boiler Plant (CPS Only)

Closes 10/14/2026Opened 9/30/2026

City of Charlotte·North Carolina

70% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

Massachusetts Town of Hull·Massachusetts

70% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

City of Roseville·California

70% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

California High‑Speed Rail Authority·California

70% match

HSR26-16 M2M Collaborative Design-Build Services

Closes 10/21/2026Opened 6/17/2026

City of West Sacramento·California

70% match

Architectural and Engineering Design Services — Rec Center Locker Room Renovation

Closes 12/4/2026Opened 9/25/2026

Washington County·Maryland

69% match

Detention Center Renovation, Phase-1

Closes 10/14/2026Opened 9/16/2026

U.S. Department Of Defense·New Jersey

69% match

Design/Build Maintenance and Repair Army Reserve (MRAR), Area Maintenance Support Activity (AMSA) 21, JBMDL, NJ

Closes 12/21/2026Opened 10/8/2026

West Basin Municipal Water·California

69% match

Server Room Construction at ECLWRF

Closes 10/22/2026Opened 9/24/2026

University Of Texas At Dallas·Texas

69% match

CMR -Engineering and Computer Science North (ECSN) and Waterview Academic and Administration Center (WAAC) Building System Renovations

Closes 10/16/2026Opened 9/4/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

69% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026