The County of Volusia is soliciting a single qualified contractor to construct the Beresford Avenue Extension Phase 2B, extending from S. Kepler Road/Dr. MLK Beltway to State Road 44 in DeLand, FL. The work includes full roadway construction, utility relocation, grading, paving, striping, signage, and associated civil engineering tasks as detailed in the attached plans and specifications. The estimated construction cost is $4.9 million, with a required performance and payment bond, insurance, and compliance with local, state, and federal regulations. Bidders must submit a lump‑sum or unit‑price bid electronically by the deadline, and must be FDOT pre‑qualified in work group 3.0‑Flexible Paving. The contract will be awarded to the lowest responsive and responsible bidder, with a local‑business preference applied where applicable.
• Scope: earthwork, sub‑grade preparation, pavement, drainage, utility relocation, traffic control, signage, and final striping.
• Estimated value: $4,911,975.
• Mandatory requirements: FDOT pre‑qualification, performance/payments bonds, insurance, compliance with Volusia County local‑preference ordinance.
• Submission: electronic via OpenGov portal by 3:01 pm Dec 1 2026; questions due by 11:59 pm Nov 17 2026.
• Award: single‑award contract; no guaranteed award date disclosed.