Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Architecture
  5. ›UCLA Center for Health Sciences Fire Sprinkler Retrofit |…

University of California Los Angeles·California

UCLA Center for Health Sciences Fire Sprinkler Retrofit | School of Medicine,(5th & 6th floor) No. 906032

Closes 11/16/2026$150k – $400kRequest for Qualification
Get bids like this by emailBid source

Description

The University of California, Los Angeles is seeking an Executive Architect to design and oversee the retrofit of fire sprinkler systems on the 5th and 6th floors of the Center for Health Sciences, School of Medicine East building. The scope includes demolition of existing ceiling, installation of new fire‑sprinkler main supply lines, new acoustical ceiling, LED lighting, mechanical diffusers, and integration of existing ceiling devices. The project totals approximately 10,666 gsf and has an estimated construction cost of $3‑4 million. The selected firm will provide architectural design, coordination, and construction administration services, complying with UC sustainability policies. • Install new fire‑sprinkler main supply lines and heads in public corridors, with connection points every 20 ft. • Remove existing ceiling, lower ceiling plane, and install a new single‑span acoustical ceiling system. • Provide new recessed LED lighting, mechanical diffusers, and extend all ceiling devices and ducts to the new ceiling plane. • Ensure compliance with University of California Policy on Sustainable Practices and any applicable building codes. • Deliver all design documents and construction administration through the UCLA Planroom system by the November 16, 2026 deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Pi‑Hsuan Kao(Principal Architect)

[email protected]

(310) 924-5310

Key dates

Opened
10/23/2026
Questions due
10/30/2026
Closes
11/16/2026

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541310
Solicitation №
0000040760

Budget estimate

$150,000 – $400,000

The project’s total construction cost is estimated at $3‑4 million. Architectural design fees typically range from 5% to 10% of construction cost for projects of this size, suggesting a fee between $150,000 and $400,000. Additional services such as construction administration could increase the total compensation, so a realistic budget range is roughly $150 k‑$400 k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

UCLA Capital Programs·California

Top match · 96%

Executive Architect - CHS Fire Sprinkler Retrofit - School of Medicine East 5th and 6th Floors

Closes 11/16/2026Opened 10/23/2026

UCLA Capital Programs·California

82% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 22 - D/B Fire Protection)

Rolling / TBD closeOpened 10/15/2026

UCLA Capital Programs·California

80% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 10 - Glass & Glazing)

Rolling / TBD closeOpened 10/23/2026

University of Massachusetts System·Massachusetts

80% match

UMA27-09 ISB, Linden, LSL, PSB, AFFF Fire Protection System Replacement | #AMHADM-2027-1156

Closes 11/30/2026Opened 10/21/2026

Orange County Department of Education·California

80% match

BID 26-05 ESPLANADE BUILDING 4 AND KALMUS BUILDING A INTERIOR IMPROVEMENTS

Closes 11/18/2026Opened 10/21/2026

UCLA Capital Programs·California

80% match

Gayley Center Real Time Safety Center (PREQUALIFICATION)

Rolling / TBD closeOpened 10/22/2026

UCLA Capital Programs·California

79% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

University of Massachusetts Amherst·Massachusetts

79% match

UMA27-09 ISB, Linden, LSL, PSB, Aqueous Film-Forming Foam (AFFF) Fire Protection System Replacement

Closes 11/30/2026Opened 10/21/2026

Oregon Health and Science University·Oregon

79% match

Fire Sprinkler System Contractors

Rolling / TBD closeOpened 4/26/2021

LAUSD·California

78% match

DESIGN BUILD | RFQ # R-27016 - 107TH STREET ELEMENTARY | SEISMIC MODERNIZATION PROJECT

Closes 12/21/2026Opened 10/16/2026

DOC - Architecture and Engineering·Virginia

78% match

Beaumont Correctional Center Sprinkler Replacement

Closes 11/18/2026Opened 10/5/2026

UCLA Capital Programs·California

78% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 20 - Interior Signage)

Rolling / TBD closeOpened 10/23/2026

North Carolina State University·North Carolina

78% match

NC State University

Closes 11/4/2026Opened 10/6/2026

UCLA Capital Programs·California

78% match

Gonda Center Deep Energy Project (RE-BID)

Closes 11/10/2026Opened 10/9/2026

University of Louisville·Kentucky

78% match

Kosair Charities Pediatrics First Floor Renovation

Closes 11/18/2026Opened 10/26/2026

UCLA Capital Programs·California

78% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 23 - Plumbing)

Rolling / TBD closeOpened 10/23/2026

Philander Smith University·Arkansas

78% match

Notice to Architects – Request for Qualifications

Closes 10/30/2026Opened 10/11/2026

UCLA Capital Programs·California

78% match

SMUMC Room 3411 Interventional Radiology Equipment Replacement

Closes 11/10/2026Opened 10/7/2026

The Trustees of the California State University·California

78% match

PW2602 University Library (UL) Egress Stair

Closes 12/17/2026Opened 9/18/2026

UCLA Capital Programs·California

78% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 5 - Window Treatment/ Overhead Curtain)

Rolling / TBD closeOpened 10/23/2026

UCLA Capital Programs·California

78% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 18a - Specialties)

Rolling / TBD closeOpened 10/23/2026

City of San Diego·California

77% match

San Diego Convention Center West Roof Replacement

Closes 11/4/2026Opened 9/30/2026

The University of Texas Health Science Center at Houston (UTHealth Houston)·Texas

77% match

Reuel A. Stallones Rehabilitation and Repair (AE Services)

Closes 11/18/2026Opened 10/21/2026