Clark County is soliciting qualified firms to bid on a comprehensive roadway and utility improvement project along a one‑mile stretch of Las Vegas Boulevard (Flamingo Rd → Spring Mountain Rd) and a three‑quarter‑mile segment of Flamingo Road (I‑15 → Koval Lane). The work includes full‑depth cold planing, resurfacing with plant‑mix bituminous material, utility relocation, storm‑drain installation, curb‑and‑gutter reconstruction, sidewalk replacement/widening, ADA‑compliant ramps, median reconstruction, bus turnouts, traffic signal upgrades at six intersections, installation of smart poles with LED lighting, waterline replacement for the Las Vegas Valley Water District, and extensive landscaping/irrigation modifications. The contract also requires compliance with prevailing‑wage rules and submission of bid bonds, subcontractor lists, and eligibility affidavits.
• Approx. 1 mi of Las Vegas Boulevard and 0.75 mi of Flamingo Rd improvements
• Cold planing, plant‑mix surface, UTACS, and pavement markings
• Curb, gutter, sidewalk, median, and bus‑turnout reconstruction
• Traffic signal modifications (6 intersections) and detector loops
• Smart‑pole and LED street‑light installation, power/communication upgrades
• New waterline installation along the entire project length
• Storm‑drain, utility adjustments, landscaping, irrigation, and ADA compliance
• Required bid bond, 5 % subcontractor list, 1 % subcontractor designation, and prevailing‑wage certification.