The Midland Independent School District (MISD) is seeking qualified contractors to provide and install sixteen ductless mini‑split HVAC units across nine elementary school campuses. Each location requires either a 1‑ton or 1.5‑ton wall‑mounted indoor unit paired with a roof‑mounted outdoor condensing unit, complete with all necessary electrical, refrigerant, and control wiring, as well as commissioning and documentation. Work will be performed in occupied school facilities, potentially requiring after‑hours or weekend labor and coordination with other construction activities. Bids must be “turn‑key,” covering all materials, labor, freight, and related costs, and must be tax‑exempt.
• 9 campus sites, total of 16 mini‑split systems (1‑ton or 1.5‑ton)
• Scope includes supply, factory‑assembly, testing, electrical panel work, conduit, refrigerant piping, condensate management, and final demonstration
• Pre‑bid campus walk‑throughs on Oct 14, 15, 21 (attendance optional)
• Questions due by Oct 22; bid submission deadline Oct 29, 2026
• Contractor must provide code‑compliant panel access, conduit, and waterproofing as detailed in the footnote
• All work must comply with ASHRAE 90.1 efficiency standards and MISD’s tax‑exempt status