Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›New Mexico
  4. ›Construction
  5. ›Civitan Park Pond Outlet Structure and Conduit Replacement

City of Farmington·New Mexico

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026$350k – $500kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Farmington is soliciting bids to replace the primary outlet structure, overflow standpipe, valves, and conduit at Civitan Park Pond. The work includes demolition, installation of a new 5’×5’ precast concrete outlet structure, and two alternate methods for installing a 20” HDPE conduit through the embankment (jack‑and‑bore or open‑cut). Additional scope covers valve vault construction, head gates, trash rack, grouting, erosion control, and site restoration. The project must comply with New Mexico Dam Safety Bureau requirements and critical winter‑season sequencing. Bidders must submit all labor, equipment, and materials via the City’s online system, attend a virtual pre‑bid meeting on 10/27/2026, and complete the work within 90 calendar days after notice to proceed. The estimated construction cost is $408,000. • Replace outlet structure and associated hydraulic components • Install 20” HDPE conduit (jack‑and‑bore or open‑cut) • Provide valve vault, head gates, trash rack, demolition and site restoration • Comply with dam safety and prevailing‑wage regulations • Submit bids electronically by 11/19/2026 • Complete work within 90 days of award

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Alena Pioche

(505) 599-1463

Key dates

Opened
10/21/2026
Questions due
11/10/2026
Pre-bid meeting
10/27/2026
Closes
11/19/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
27-169384

Budget estimate

$350,000 – $500,000

The solicitation lists an Engineer’s Opinion of Probable Construction Costs (OPCC) of $408,000, which is the baseline estimate for the full scope. Considering typical contractor mark‑ups, bonding, and potential change‑order adjustments, the total contract value is likely to fall between $350,000 and $500,000. Factors influencing the final amount include the selected conduit installation method (jack‑and‑bore vs. open‑cut), winter‑season sequencing constraints, and any required additional mitigation (erosion control, traffic management).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Nevada Government·Nevada

Top match · 82%

Carson City Centennial Park Drainage Project

Closes 10/22/2026Opened 9/30/2026

City of Colorado Springs·Colorado

82% match

Valley Hi Irrigation Pond Repairs

Closes 10/28/2026Opened 10/14/2026

North Carolina City of Raleigh·North Carolina

81% match

Camp Pond Dam Reconstruction Project

Closes 11/5/2026Opened 9/22/2026

City of Creve Coeur·Missouri

81% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Maryland Chevy Chase Village·Maryland

81% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

Northern Virginia Parks·Virginia

81% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·Kentucky

81% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Washington Suburban Sanitary Commission, MD·Maryland

81% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

City of Charlotte·North Carolina

80% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Oregon Parks and Recreation Department·Oregon

80% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation·Massachusetts

80% match

Bellevue Pond Dam Rehabilitation

Closes 10/29/2026Opened 9/16/2026

City of North Charleston·South Carolina

80% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Town of Lexington·South Carolina

80% match

Cherry Ridge Drainage Improvements Project

Closes 10/29/2026Opened 10/14/2026

Clark County·Nevada

80% match

Indian Springs Park Baseball Field Irrigation Replacement

Closes 10/26/2026Opened 9/22/2026

City of Parkersburg·West Virginia

80% match

BID 2760 - 2026-12 SOUTHWOOD POND OVERFLOW PIPE REPAIR

Closes 10/27/2026Opened 10/19/2026

Town of Lexington·South Carolina

80% match

CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2026Opened 10/14/2026

City of North Charleston·South Carolina

80% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

Oregon Clackamas County·Oregon

80% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/10/2026Opened 10/7/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Central Florida Tourism Oversight District·Florida

80% match

ECEP Cooling Tower Basin Improvements

Closes 10/26/2026Opened 9/24/2026

Connecticut City of Bristol·Connecticut

80% match

Diffused Aeration System Replacement

Closes 10/23/2026Opened 9/25/2026

City of Casper·Wyoming

80% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Delaware County Regional Sewer District·Ohio

80% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Town of Clinton·Connecticut

80% match

Replacement of Bridge No. 06956, Country Village Lane

Closes 11/4/2026Opened 10/7/2026