Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wisconsin
  4. ›Construction
  5. ›2026 Utility Line Opening (ULO) Project

Madison Metropolitan Sewerage District·Wisconsin

2026 Utility Line Opening (ULO) Project

Closes 11/12/2026$100k – $250kInvitation for Bid
Get bids like this by emailBid source

Description

The Madison Metropolitan Sewerage District (MMSD) is seeking qualified contractors to perform utility line opening (ULO) services at multiple designated sites throughout Madison, WI. The work involves excavating to locate and verify underground sanitary sewer interceptors and force mains, providing traffic control, obtaining necessary permits, and restoring all disturbed surfaces (pavement, landscaping, etc.) to their original condition. Bids must be submitted as a lump‑sum amount, with all costs—including permits, traffic control, and restoration—included. The contract will be awarded to the lowest responsive and responsible bidder, with invoicing required by December 20 2026. • Scope: 20+ individual ULO locations ranging from 5‑14 ft depth in grassy or paved areas. • Required experience: Minimum 3 years performing utility line openings on sanitary sewer interceptors and force mains. • Mandatory qualifications: Insurance coverage (minimum $2 M general liability, $1 M per occurrence, $1 M auto, $2 M umbrella, workers’ comp per state law), permits, traffic control, and site restoration. • Submission: Sealed lump‑sum bid due 11 a.m. CST, 12 Nov 2026; questions due 5 Nov 2026. • Contact: Erik Rehr, Collection System Manager (608‑709‑1833, [email protected]).

Attached files

Contact

Erik Rehr(Collection System Manager)

[email protected]

(608) 709-1833

Key dates

Opened
10/22/2026
Questions due
11/5/2026
Closes
11/12/2026
Duration
1 month

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238910
Solicitation №
MMSD, 2026 Utility Line Opening (ULO) Project

Budget estimate

$100,000 – $250,000

No contract value is disclosed, but based on typical utility line opening rates ($4,000‑$12,000 per site) and an estimated 15‑20 locations, the total contract could range from roughly $100,000 to $250,000. Factors influencing the final amount include site conditions (grassy vs. paved), depth of excavation, traffic control complexity, and restoration requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware County Regional Sewer District·Ohio

Top match · 84%

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Wheaton·Illinois

83% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

Town of Berlin·Connecticut

83% match

Emergency Sewer Services Including Sewer Pump Stations (Re-bid)

Closes 10/29/2026Opened 10/9/2026

City of Fairfield·Ohio

83% match

2026 Storm Sewer Rehabilitation via PVC Lining

Closes 10/26/2026Opened 10/9/2026

City of Aurora, IL·Illinois

83% match

2027 Water & Sewer Maintenance Division Materials and Supplies

Closes 10/30/2026Opened 10/15/2026

Lucas County, OH Sanitary Engineer·Ohio

82% match

ReBid Interceptor Sanitary Sewer No. 500 – Phase Four Rehabilitation (MH 6 to MH 8)

Closes 10/29/2026Opened 9/24/2026

City of Aurora, IL·Illinois

82% match

2027 & 2028 Water & Sewer Maintenance Division Emergency Repair Program

Closes 10/30/2026Opened 10/14/2026

City of Minneapolis·Minnesota

82% match

BID-PW-Private Water and Sewer Svc Relocation 2027

Closes 11/3/2026Opened 10/16/2026

Wayne-Finger Lakes BOCES·New York

82% match

Cooperative Plumbing Services Bid

Closes 10/29/2026Opened 10/14/2026

City of Moline·Illinois

82% match

CHS-H-47-51 JACOBSEN - 1002 53rd street Moline, IL

Closes 10/28/2026Opened 10/14/2026

City of Aurora, IL·Illinois

82% match

2027 & 2028 Water & Sewer Maintenance Division Plumbing Services

Closes 10/30/2026Opened 10/15/2026

County of Maui·Hawaii

82% match

Upper Waiko Road Sewer Extension and Waikapu Waterline Project

Closes 11/2/2026Opened 10/6/2026

City of Shawnee·Kansas

82% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Davenport·Iowa

82% match

FY27-28 Contract Sewer Repair Program

Closes 11/12/2026Opened 10/21/2026

Texas Midwestern University·Texas

82% match

RFP Tunnel Surface Improvement Project

Closes 11/12/2026Opened 10/14/2026

City of West Des Moines·Iowa

82% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Independence·Missouri

81% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

City of Cincinnati·Ohio

81% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 10/27/2026Opened 10/7/2026

City of Opa-locka·Florida

81% match

ITB 26-1113200 Sewer Infrastructure Improvement Project

Rolling / TBD closeOpened 10/14/2026

City of Lynchburg·Virginia

81% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Rochester Public Utilities·Minnesota

81% match

Power Line Clearance Tree Services

Closes 10/26/2026Opened 9/24/2026

Portage County·Ohio

81% match

2025 Sewer Maintenance Program (Franklin Hills P.S.)-Bid

Rolling / TBD closeOpened 4/22/2026

City of Braintree·Massachusetts

81% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026