Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›East Highline Reservoir Project

Imperial Irrigation District·California

East Highline Reservoir Project

Closes 12/2/2026$15M – $25MRequest for Proposal
Get bids like this by emailBid source

Description

The Imperial Irrigation District is seeking a qualified contractor to design and construct the East Highline Reservoir (EHR) – a 2,100 acre‑foot off‑line storage reservoir and a 1.8‑mile intake canal in Imperial County, California. The scope includes mobilization, traffic control, extensive earthwork, deep‑dynamic‑compaction and stone‑column ground improvement, concrete and steel structures (gate buildings, spillway, inlet/outlet gates, metering bridge), fiber‑reinforced concrete and geomembrane lining, cathodic‑protection systems, mechanical/electrical equipment (generators, PLC, telemetry, flow/level instruments), environmental mitigation (wetland turnout, storm‑water pollution prevention), demolition, de‑watering, and full commissioning. The contractor must provide all labor, materials, permits, safety programs, and comply with Buy‑America, California OSHA, and EPA regulations. • Comprehensive civil‑construction package covering reservoir excavation, embankments, canal lining, and structural gate installations. • Mechanical/electrical scope includes slide‑gates, overshoot gates, generators, PLC‑based control systems, and telemetry. • Environmental and safety requirements mandate storm‑water plans, hazardous‑waste handling, emissions compliance, and mandatory pre‑bid job‑walk.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jasmine Ramirez(Purchasing Agent)

[email protected]

(760) 339-9270

Key dates

Opened
9/10/2026
Questions due
11/4/2026
Pre-bid meeting
9/30/2026Mandatory
Site visit
9/30/2026Mandatory
Closes
12/2/2026
Duration
21 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
PRFP 1647

Budget estimate

$15,000,000 – $25,000,000

Based on the disclosed line‑item costs (approximately $15.5 M) and the many lump‑sum items without published prices, the total contract value is likely in the $15‑25 million range. Factors influencing the final amount include the magnitude of earthwork, the cost of specialized gate equipment, geosynthetic lining, and the required safety and environmental compliance measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of The Interior·Colorado

Top match · 85%

Y--EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/25/2026

U.S. Department Of The Interior·Utah

85% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

The Metropolitan Water District of Southern California·California

83% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Imperial Irrigation District·California

82% match

Clubhouse Bale Expansion Project

Closes 11/3/2026Opened 9/22/2026

City and County of San Francisco·California

82% match

EXT REC | CON26-0030 Camp Mather InfrastructureRFQ

Closes 12/31/2026Opened 1/13/2026

Inland Empire Utilities Agency·California

81% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

City of Port Arthur·Texas

81% match

PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION (EDC) SPUR 93 AND JADE AVENUE BUSINESS PARK LANDSCAPE AND IRRIGATION MAINTENANCE

Closes 10/30/2026Opened 10/12/2026

City of Pomona·California

81% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

City of Troy, OH·Ohio

81% match

Miami Shores Golf Course Irrigation System Renovation Project

Closes 11/4/2026Opened 10/14/2026

City of Rapid City·South Dakota

81% match

North Rapid Reservoir at Elk Vale Rd., Project No. 2922/CIP No. 50474

Closes 10/28/2026Opened 10/7/2026

The Metropolitan Water District of Southern California·California

81% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/3/2026Opened 9/4/2026

City of Santa Rosa·California

81% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

City of Hickman, Nebraska·Nebraska

80% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

City of Port Arthur·Texas

80% match

PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION (EDC) SPUR 93 AND JADE AVENUE BUSINESS PARK LANDSCAPE A

Closes 10/30/2026Opened 10/12/2026

City of Santa Monica·California

80% match

San Vicente and Mt. Olivette Reservoir Improvements Project - Construction

Closes 11/5/2026Opened 9/8/2026

U.S. Department Of Defense·Kentucky

80% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Huntington Beach·California

80% match

CC 1698 - Well 4 Facilities Upgrades

Closes 10/29/2026Opened 10/7/2026

Eastern Municipal Water District·California

80% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

Santa Clara Valley Water District·California

80% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

City of Riverside·California

80% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

City of Colorado Springs·Colorado

80% match

Valley Hi Irrigation Pond Repairs

Closes 10/28/2026Opened 10/14/2026

County of Sacramento·California

80% match

Gibson Ranch Park Water Well Monitoring

Closes 10/30/2026Opened 10/2/2026

Massachusetts City of Newburyport·Massachusetts

80% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026

The Metropolitan Water District of Southern California·California

79% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026