Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Massachusetts
  4. ›Closed bids
  5. ›Transmission Main and Water Main upgrade

Massachusetts Chelmsford Water District·Massachusetts

Transmission Main and Water Main upgrade

Closes 3/11/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Chelmsford Water District is seeking a qualified contractor to replace and upgrade its transmission and water mains. The scope includes installing roughly 3,700 ft of 8‑inch ductile‑iron water main, about 40 new water service connections, bypass piping, 1,100 ft of 10‑inch ductile‑iron transmission pipe, 7,600 ft of 10‑inch HDPE transmission pipe, and modifying the Davis Street valve vault, with associated paving work. The contractor must complete the major construction within 214 consecutive calendar days, followed by a 30‑day final paving period, and comply with Massachusetts prevailing‑wage and payroll reporting requirements. A 5 % bid security is required. • Install 3,700 ft of 8‑in DI water main and 40 service connections • Install 1,100 ft of 10‑in DI transmission pipe plus 7,600 ft of 10‑in HDPE transmission pipe • Modify Davis Street valve vault and perform initial and final paving within a tight schedule • Must meet state prevailing‑wage rules and submit payroll documentation • Bid deadline March 11 2026 1:00 PM; documents available from February 11 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lisa Quatrale(Business Director/Treasurer)

[email protected]

(978) 256-2931

Key dates

Opened
2/11/2026
Closes
3/11/2026
Duration
214 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
BD-26-1770-CWD01-CWD01-124990

Budget estimate

$2,000,000 – $5,000,000

Based on typical unit costs for ductile‑iron and HDPE pipe installation, plus excavation, backfill, valve‑vault modification, and paving, a project of ~12,200 ft of pipe and 40 services in Massachusetts usually ranges from $2 M to $5 M. The lower bound assumes minimal site complications and modest labor rates; the upper bound accounts for higher prevailing‑wage labor, complex coordination, and the 30‑day final paving extension.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Hastings Utilities·Nebraska

Top match · 71%

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Santa Barbara·California

70% match

Transmission Main Renewal Phase 2

Closes 10/16/2026Opened 9/10/2026

Joint Municipal Water and Sewer Commission·South Carolina

69% match

JMWSC Water Main Improvements from Charter Oak Tank to Calks Ferry Tank

Closes 10/15/2026Opened 9/11/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

69% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Massachusetts Town of Abington·Massachusetts

68% match

Abington Central Street Water Main Improvements

Closes 10/28/2026Opened 10/7/2026

City of Dunedin·Florida

68% match

Willow Wood Village Water Main Replacement

Closes 10/19/2026Opened 9/18/2026

City of DeLand·Florida

67% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Newton·Massachusetts

67% match

2026 Water Main Rehabilitation at Various Locations

Closes 10/29/2026Opened 10/1/2026

City of Edgewater, FL·Florida

67% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Fort Wayne·Indiana

67% match

67616 - Tract 11 Lead Service Line and WMR

Closes 10/29/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

Joint Municipal Water and Sewer Commission·South Carolina

66% match

Town of Pelion Water Main Improvements Phase 2

Closes 10/13/2026Opened 9/11/2026

City of Morgan Hill·California

66% match

2026 Morgan Hill Water Main Replacement Project

Closes 10/20/2026Opened 9/25/2026

Goodwyn Mills Cawood·Alabama

65% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Oregon City of Monroe·Oregon

65% match

Water System Modernization and Raw Water Intake Improvements

Closes 10/23/2026Opened 9/22/2026

City of Charlotte·North Carolina

65% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Wauchula·Florida

65% match

HEARD BRIDGE WATER MAIN LOOP

Closes 10/16/2026Opened 9/16/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Charlotte·North Carolina

65% match

Mallard Connector Main

Rolling / TBD closeOpened 3/1/2027

City of Alexandria·Louisiana

65% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

Nevada Government·Nevada

65% match

E Street & F Street Water Main Relocation

Closes 10/13/2026Opened 9/22/2026

Edgefield County Water and Sewer Authority·South Carolina

64% match

EAST WISE STREET WATER MAIN REPLACEMENT

Closes 10/27/2026Opened 9/22/2026

Fauquier Water & Sanitation Authority·Virginia

64% match

Bealeton Lift Station Wet Well Upgrade

Closes 10/13/2026Opened 9/14/2026