The City of Duarte is seeking a single‑prime contractor to fully redevelop Duarte Park (Phase II), encompassing demolition of existing structures, extensive site grading, utility upgrades, and construction of new park amenities. The contract includes interior and exterior demolition, grading, new water‑distribution, sanitary‑sewer and storm‑drain utilities, electrical distribution and lighting, asphalt and concrete paving, synthetic turf installation, playground and basketball‑court construction, dog‑park facilities, metal fencing, and installation of owner‑furnished prefabricated restrooms and picnic shelters. All work must comply with California Building, CALGreen, and ADA standards, and the contractor must provide required bonds, insurance, and a one‑year warranty.
• Demolition of existing playground, basketball court, building, and related site features, followed by grading and earthwork.
• Installation of new utilities (water, sewer, storm‑drain, electrical) and site‑wide LED lighting.
• Construction of new hard‑scape (asphalt, concrete, synthetic turf), playground equipment, basketball court, dog‑park, metal fencing, and coordination of prefabricated restroom and shelter structures.
• Full compliance with CALGreen sustainability, ADA accessibility, and required insurance/bond guarantees; 130‑day construction schedule with liquidated damages for overruns.