This project involves comprehensive improvements along the 5th Street corridor in Waconia, including extensive civil works, utility installations, and roadway reconstruction. The scope covers excavation, granular borrow, aggregate base placement, bituminous paving, concrete sidewalk and curb work, sanitary sewer and watermain installation, water service connections, and storm sewer construction, as well as ancillary tasks such as tree cutting, retaining walls, erosion control, bank stabilization, traffic control, and ADA compliance.
• 5,000 cu yd common excavation and 5,500 ton granular borrow
• Installation of 1,200 lin ft sanitary sewer, 1,300 lin ft watermain, and 1,000 lin ft storm sewer
• Concrete sidewalk (4,000 sq ft) and curb & gutter (3,900 lin ft) with ADA curb ramps
• Additional work includes aggregate base, bituminous paving, tree cutting, retaining walls, erosion control, and roadway markings.