Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›South Carolina
  4. ›Civil Engineering
  5. ›Addendum 1 Cherry Ridge Drainage Improvements

Town of Lexington·South Carolina

Addendum 1 Cherry Ridge Drainage Improvements

Closes in 2 days$500k – $2MInvitation for Bid
Get bids like this by emailBid source

Description

The Town of Lexington is seeking a qualified contractor to perform comprehensive storm‑drainage improvements in the Cherry Ridge Subdivision. The scope includes mobilization, traffic control, clearing & grubbing, excavation, backfilling, installation of various storm‑pipe sizes (15", 18", 30", 36", 42", 42” Class IV RCP, 15” storm pipe, etc.), construction of headwalls, catch basins, junction boxes, rolled curb replacement, pavement removal and resurfacing, erosion control, fence removal/replacement, and yard restoration with sod. The contractor must coordinate utility relocations (6‑in. water main, existing utilities), protect existing services, and comply with SCDOT and manufacturer specifications. An add‑alternate scope adds additional pipe work and yard inlet installation. All work must be performed with minimal disruption to residential properties and include documentation, as‑built drawings, and compliance testing. • Mobilization, traffic control, and site clearing • Excavation, stone backfill, fine grading, and rip‑rap installation • Installation of multiple storm‑pipe diameters and associated structures (headwalls, catch basins, junction boxes) • Coordination of water‑main relocation and utility protection • Pavement removal, backfill, and new HMA surface placement • Erosion control, fence removal/replacement, and yard restoration (sod, mulch) • Required documentation, utility locate (811 call), and compliance with SCDOT specs.

Attached files

Contact

(803) 732-7080

Key dates

Opened
10/22/2026
Questions due
10/26/2026
Pre-bid meeting
10/20/2026
Closes
10/29/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237310
Solicitation №
27-03

Budget estimate

$500,000 – $2,000,000

Based on typical unit prices for storm‑pipe installation, excavation, backfill, curb replacement, and road resurfacing in South Carolina, a full‑subdivision drainage upgrade of this magnitude (several hundred linear feet of pipe, multiple catch basins, and extensive paving) would likely fall in the $0.5 million to $2 million range. The lower bound assumes minimal add‑alternate work and modest material costs; the upper bound reflects the full add‑alternate scope, higher‑grade pipe, extensive paving, and contingency allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Lexington·South Carolina

Top match · 92%

CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT - REVISED

Closes 10/29/2026Opened 10/23/2026

Town of Lexington·South Carolina

91% match

Cherry Ridge Drainage Improvements Project

Closes 10/29/2026Opened 10/14/2026

Town of Lexington·South Carolina

87% match

CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2026Opened 10/14/2026

City of Peachtree City·Georgia

84% match

Tuxedo Lane Drainage Improvements (amended)

Closes 11/17/2026Opened 10/15/2026

Georgia City of Peachtree City·Georgia

84% match

Tuxedo Lane Drainage Improvement Project (10/19 amended)

Closes 11/17/2026Opened 10/15/2026

City of Charlotte·North Carolina

83% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Greenville County·South Carolina

83% match

Suffolk Drive Drainage Improvements

Closes 10/29/2026Opened 9/25/2026

City of Salina·Kansas

83% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

City of Charlotte·North Carolina

83% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

City of Charlotte·North Carolina

83% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Salina·Kansas

83% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Indianapolis·Indiana

82% match

SD-23-103 Thoroughfare Drainage Improvements Area 8

Closes 10/29/2026Opened 10/2/2026

Maryland Chevy Chase Village·Maryland

82% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

City of Louisville·Colorado

82% match

Addendum

Rolling / TBD closeOpened 10/23/2026

City of Charlotte·North Carolina

82% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

Massachusetts City of Newburyport·Massachusetts

82% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026

City of Salina·Kansas

82% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Brandon·Mississippi

82% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

82% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

82% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

Maryland Baltimore City Department of Public Works·Maryland

82% match

Drainage Repairs and Improvements at Various Locations

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

82% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of North Charleston·South Carolina

82% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of Salina·Kansas

82% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Charlotte·North Carolina

82% match

Wood Dale Ter 2022 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/23/2026