Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Michigan guideMichigan Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Michigan
  4. ›Surveying, Drafting, and Design Services for the Installation of Wa…

Lansing Board of Water & Light·Michigan

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations

Closes 10/22/2026$500k – $2MRequest for Proposal
Get bids like this by emailBid source

Description

The Lansing Board of Water and Light (BWL) seeks a qualified consulting firm to provide comprehensive surveying, base mapping, design, permitting, geotechnical, and construction‑engineering services for the replacement and installation of multiple water mains throughout the city. The scope covers topographic surveys, detailed design drawings (including plans, profiles, traffic and erosion control), permit acquisition, core sampling and geotechnical analysis, construction‑phase engineering support, and final as‑built documentation. The consultant must submit phased design deliverables (50%, 75%, 95%, and final), three budgetary design scenarios per segment, and a full fee proposal with a not‑to‑exceed cap. The work must be completed by mid‑January 2027 for design tasks, with construction engineering to begin in spring 2027. • Mandatory pre‑bid meeting 10/14/2026 (in‑person or virtual). • Surveying of existing utilities, curb lines, and right‑of‑way conditions. • Design of 8‑inch and 6‑inch ductile‑iron water mains, hydrants, valves, and service tie‑ins across three street segments. • Preparation of construction‑ready plans at 1" = 40' scale, including traffic, erosion, and environmental controls. • Permit assistance and coordination with City of Lansing and state agencies. • Geotechnical coring, soil classification, and reporting. • Construction‑phase engineering, inspection, CCTV, and final punch‑list. • Fee proposal based on actual cost plus overhead/profit, with required insurance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ali Abdul-Wahab(Purchasing Department)

[email protected]

(517) 702-6941

Key dates

Opened
9/29/2026
Questions due
10/16/2026
Pre-bid meeting
10/14/2026Mandatory
Closes
10/22/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
202609230001 Addendum 1

Budget estimate

$500,000 – $2,000,000

The RFP does not disclose a total contract value. Based on the scope (multiple water‑main segments, detailed design, geotechnical work, and construction‑phase engineering) and typical municipal water‑main design fees in Michigan (approximately $150–$250 per linear foot for design and $300–$500 per linear foot for combined design‑plus‑construction support), a reasonable estimate ranges from about $500,000 for a minimal design effort to $2,000,000 for a full‑service, multi‑segment engagement. Factors influencing the final amount include the chosen construction method (open‑cut vs. directional drilling), the number of design scenarios submitted, and any additional geotechnical or environmental studies required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lansing Board of Water & Light·Michigan

Top match · 99%

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations

Closes 10/22/2026Opened 9/29/2026

KC Board of Public Utilities·Kansas

85% match

Surveying and Services

Closes 11/4/2026Opened 9/25/2026

City of Nixa·Missouri

83% match

Professional Civil Engineering Services

Closes 11/17/2026Opened 10/14/2026

Maryland Mayor and Town Council of Oakland·Maryland

82% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

Oregon City of Monroe·Oregon

82% match

Water System Modernization and Raw Water Intake Improvements

Closes 10/23/2026Opened 9/22/2026

City of Richmond·Virginia

81% match

Water Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

Boone County·Kentucky

81% match

PROFESSIONAL ENGINEERING AND DESIGN SERVICES

Closes 10/30/2026Opened 10/8/2026

City of West Columbia·South Carolina

81% match

Lee Circle Water Main Replacement

Closes 10/20/2026Opened 9/17/2026

City of Ann Arbor·Michigan

80% match

Professional Engineering Services for Dam Support

Closes 11/10/2026Opened 10/1/2026

City of Superior·Wisconsin

80% match

Engineering Services Lead Lines 2027

Closes 10/27/2026Opened 9/28/2026

City of Fort Myers·Florida

80% match

Downtown Stormwater Drainage Improvements - First Street Flood Risk Reduction Professional Services

Closes 10/30/2026Opened 9/28/2026

City of Farmers Branch·Texas

80% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of Glendale·California

80% match

On-Call Water Resources and Engineering Consulting Services

Closes 10/19/2026Opened 9/14/2026

City of Fort Wayne·Indiana

79% match

67680 - Tract 10 Lead Service Line and WMR

Closes 10/22/2026Opened 10/2/2026

Town of Springfield·Vermont

79% match

Springfield Water Service Hydroexcavation

Closes 11/6/2026Opened 10/12/2026

Lansing Board of Water & Light·Michigan

79% match

Utility Network Project

Closes 10/21/2026Opened 9/16/2026

City of Folsom·California

79% match

Water Rehabilitation Project No. 3

Closes 10/23/2026Opened 9/24/2026

City of Port Arthur·Texas

79% match

ENGINEERING SERVICE FOR STREET & DRAINAGE PROJECTS

Closes 10/28/2026Opened 9/28/2026

City of Richmond·Virginia

79% match

Stormwater Annual Engineering Services

Closes 10/23/2026Opened 9/23/2026

City of Beaverton·Oregon

79% match

Erickson Ave Waterline Replacement (2nd St to 5th St)

Closes 10/21/2026Opened 9/30/2026

City of Hastings Public Works / Utilities·Nebraska

79% match

Lakeview 11th Water & SS Extension Dist 2026-1 HU 2026-77

Rolling / TBD closeOpened 7/21/2026

Lewis County·Washington

79% match

Design and Engineering for Davis Lake Road MP 1.67 Slide Repair Project

Closes 11/13/2026Opened 10/8/2026

Central Arkansas Water·Arkansas

79% match

Consulting Engineering Services for Lake Maumelle Pump Station Condition Assessment and Preliminary Engineering Study

Closes 11/5/2026Opened 9/27/2026

City of Richmond Government·Virginia

79% match

RFP No. 270005805 Water Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

Clay Electric Cooperative·Florida

79% match

Land Surveying Services

Closes 10/27/2026Opened 10/12/2026