This contract awards pre‑design services for the Outagamie County Highway Department to develop site‑improvement plans for multiple garage and facility locations. The scope includes comprehensive site planning, utility location and documentation, incorporation of county‑provided geotechnical data, environmental review recommendations, and preparation of conceptual drawings, cost estimates, and schematic prints for each site. The work must be completed by June 1 2025 and will support future construction slated for spring 2026.
• Site‑specific pre‑design deliverables for Hortonia, Appleton, and optional services at Seymour and Shiocton.
• Requirements to locate and document all underground utilities, incorporate county‑provided geotechnical reports, and coordinate environmental testing (soil, asbestos) – costs borne by the County.
• Deliverables in both electronic (.dwg, .pdf) and hard‑copy formats, plus a high‑level cost opinion covering civil, utility, construction, and potential self‑performance savings.