Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Texas
  4. ›Construction
  5. ›NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK…

Brazos Valley·Texas

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes in 4 days$7M – $12MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Bryan is soliciting competitive sealed proposals for three related civil‑construction packages: (A) construction of a new north‑west sanitary sewer interceptor, (B) bank stabilization and effluent‑discharge pipe replacement at the Still Creek Sewer Plant, and (C) replacement of three pumps, associated piping, valves, and slide gates at the Still Creek WWTP. Work includes demolition, pipe installation (PVC and ductile‑iron), sheet‑pile and rip‑rap protection, temporary bypass pumping, and full site restoration. The contractor must obtain all permits, provide performance and payment bonds (100 % of contract price), supply warranties, O&M manuals, and manage all construction activities from mobilization through final completion. The anticipated construction start is early March 2027, with package B requiring the longest schedule (≈120 working days) and packages A and C each about 75 working days. A mandatory pre‑proposal meeting and site walk‑through are scheduled for 13 Oct 2026; questions are due 23 Oct 2026; proposals are due 3 Nov 2026. The contract award is expected 8 Dec 2026, with a notice‑to‑proceed 2 Jan 2027. • Scope: new sewer interceptor, bank stabilization, pump & pipe replacement. • Location: Along SH 21, ~1,200 ft SW of FM 2818/SH 21, Bryan, TX. • Estimated budget: not disclosed (typical range $5‑$15 M for similar municipal sewer projects). • Required bonds: 100 % performance & payment bonds; 5 % bid bond. • Mandatory pre‑bid meeting & site visit on 13 Oct 2026. • Submission deadline: 3 Nov 2026, 3 PM CST (electronic or sealed hard copy). • Award anticipated: 8 Dec 2026; contract execution by 15 Dec 2026. • Project duration: up to 120 working days (package B).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ashley Foley(Buyer)

[email protected]

Key dates

Opened
10/6/2026
Questions due
10/23/2026
Pre-bid meeting
10/13/2026Mandatory
Site visit
10/13/2026Mandatory
Closes
11/3/2026
Projected award
12/8/2026
Duration
120 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
27-001 Addendum 3

Budget estimate

$7,000,000 – $12,000,000

The RFP does not disclose a total contract value. Comparable municipal sewer interceptor and pump‑replacement projects in Texas typically range from $5 million for a modest interceptor and pump swap to $15 million when extensive bank stabilization and multiple pump units are involved. Assuming an average unit cost of $2 million for the interceptor, $3 million for the bank stabilization, and $2 million for the pump replacement (including equipment, labor, and bonding), the total contract value would likely fall between $7 million and $12 million. Factors influencing the final budget include the final engineered design, any value‑engineering substitutions, local material costs, and the scope of ancillary work (e.g., temporary bypass systems, environmental controls).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Brazos Valley·Texas

Top match · 98%

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Brazos Valley·Texas

96% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Brazos Valley·Texas

95% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Lynchburg·Virginia

85% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Mansfield·Texas

85% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

Brazos Valley·Texas

84% match

Tabor Pump Station - Pump and Electrical Improvements

Closes 11/3/2026Opened 10/12/2026

Brazos Valley·Texas

84% match

Tabor Pump Station - Pump and Electrical Improvements

Closes 11/3/2026Opened 10/12/2026

City of Douglas·Wyoming

83% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Shawnee·Kansas

83% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Brazos Valley·Texas

83% match

MIDTOWN PARK BATHROOMS UTILITY INSTALLATION AND HOOK UP

Closes 11/12/2026Opened 10/22/2026

City of Cleveland·Ohio

83% match

120-26 - Constructing & Installing Replacement Sewers & Repairing & Rehabilitation of Existing Sewers

Closes 12/2/2026Opened 10/29/2026

Western Virginia Water Authority·Virginia

82% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Rosenberg·Texas

82% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Whitehall·Ohio

82% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

City of Charlotte·North Carolina

82% match

Louise Ave Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2026

U.S. Department Of Defense·Kansas

82% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026

City of Charlotte·North Carolina

82% match

North Hoskins Rd 601 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Greenwood Metropolitan District·South Carolina

82% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Douglas·Wyoming

82% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Georgia City of Cartersville·Georgia

82% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Austin·Texas

82% match

Boggy Creek MLK TOD Strmwater Conveyance Improvements Ph-3

Rolling / TBD closeOpened 9/14/2026

City of Fort Wayne·Indiana

82% match

77441 - 2026 Sewer Rehabilitation #2 (Large Diameter)

Closes 11/19/2026Opened 10/29/2026

Brazos Valley·Texas

82% match

Annual Contract for Demolition of Structures

Closes 11/4/2026Opened 10/16/2026

City of Charlotte·North Carolina

82% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026