The State of Michigan is soliciting bids for the design‑build of underground mechanical utilities at the Woodland Correctional Facility (Whitmore Lake, Livingston County). The scope includes installation of water mains, sanitary sewer lines, storm drainage, utility conduit, hydro‑excavation, de‑watering, and associated site work, with detailed plans for lift stations, valve vaults, and phased construction to maintain prison operations. The contract will be awarded to a qualified contractor who can manage the full lifecycle from design through construction, including field verification of existing utilities, coordination with multiple agencies, and compliance with environmental and safety standards.
• Location: Whitmore Lake, Livingston County, Michigan
• Project type: Underground water, sewer, and utility infrastructure for a correctional facility
• Required services: Design, hydro‑excavation, utility installation, de‑watering, site restoration, and phased construction management
• Key dates: Review phases on 08‑15‑2024 and 12‑05‑2024; final submission deadline 10‑09‑2026; award expected 12‑01‑2025
• Mandatory compliance: Field verification of existing utilities, safety fencing, erosion control, and coordination with state agencies
• Estimated contract length: Approximately 2 years, with multiple construction phases
• Primary contact: Kristi Zakrzewski (Buyer) –
[email protected] – (517) 243‑5669