The State of Michigan is soliciting contractors to design and construct the underground mechanical infrastructure for the Woodland Correctional Facility located in Whitmore Lake, Livingston County. The scope includes installation of water mains, sanitary sewer lines, electrical conduit, hydro‑excavation of utility crossings, de‑watering, and related site improvements such as trenching, back‑filling, and temporary fencing. The project requires coordination with existing utilities, field verification of conduit sizes, and compliance with soil erosion and sedimentation control plans. Contractors must provide detailed phasing plans to maintain prison operations during construction and must be capable of handling hydro‑excavation, directional drilling, and utility location services.
• Location: Whitmore Lake, Livingston County, MI
• Work: Underground water, sewer, electrical, and related mechanical utilities
• Required services: Design, construction, hydro‑excavation, de‑watering, phasing, site safety and fencing
• Schedule: Phasing dates noted (08‑15‑2024 for 50 % phase, 12‑05‑2024 for 90 % phase) with final submission deadline 10‑09‑2026
• Key contacts: Kristi Zakrzewski (procurement) and various engineering firms (e.g., NF Engineers, Matrix Consulting Engineer’s, Inc.)