Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Minnesota
  4. ›Closed bids
  5. ›St. Paul Campus NE District Infrastructure Improvements

University of Minnesota·Minnesota

St. Paul Campus NE District Infrastructure Improvements

Closes 9/21/2026$65k – $130kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota is seeking an architectural/engineering firm to provide full‑service design (schematic, design development, construction documents, and construction administration) for Phase 1 of a chilled‑water infrastructure corridor on the St. Paul campus. The scope includes mechanical, civil, electrical, fiber, traffic and site‑restoration design, coordination with multiple campus departments, and preparation of a constructible set of documents that will support a $1.3 M construction budget. The contract is a fixed‑price lump‑sum and must be awarded by late September 2026, with design deliverables due by 31 December 2026 and construction slated for Spring 2027. • Project: NE District chilled‑water corridor (Dudley Ave between Gortner Ave & Lindig St) – Phase 1 • Services: Full A/E design (schematic, design development, construction documents, construction admin) plus supplemental coordination (civil, electrical, OIT/fiber, traffic, site restoration) • Budget: Construction cost $1.3 M; design fee to be a lump‑sum (typically 5‑10 % of construction cost) • Key dates: RFP issued 31 Aug 2026, pre‑proposal meeting 10 Sept 2026 (non‑mandatory), questions due 14 Sept 2026, proposals due 21 Sept 2026, award 30 Sept 2026, design completion 31 Dec 2026, construction start Spring 2027 • Evaluation: Team qualifications (30 %), project schedule (30 %), fee (30 %), work plan (10 %) • Contract: AIA B101‑2017 (modified) with fixed lump‑sum fee, no deviations allowed • Contact: Kevin Sullivan (Bid Contact) – [email protected]

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kevin Sullivan(Bid Contact)

[email protected]

Key dates

Opened
8/31/2026
Questions due
9/14/2026
Pre-bid meeting
9/10/2026
Closes
9/21/2026
Projected award
9/30/2026
Duration
3 months

Last updated

Details

Type
Request for Proposal
Industry
Architecture
NAICS
541310
Solicitation №
02-300-26-3917

Budget estimate

$65,000 – $130,000

The construction budget is $1,300,000. Typical design fees for university infrastructure projects range from 5 % to 10 % of construction cost. Applying that range yields an estimated design fee between $65,000 and $130,000. The final amount will depend on the firm’s proposed fee structure, the proportion of optional services, and any negotiated adjustments.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 65%

STL District, University City, removal of the bridge on Kempland Place crossing River Des Peres

Closes 10/20/2026Opened 9/15/2026

Oregon Bethel School District #52·Oregon

64% match

ITB - Site Improvement Project for K-12 School District

Closes 10/20/2026Opened 9/9/2026

Radford University·Virginia

64% match

IFB - IMPROVE CAMPUS UTILITIES INFRASTRUCTURE - ELECTRICAL

Closes 10/15/2026Opened 9/15/2026

Missouri Department of Transportation·Missouri

63% match

STL District, City of St. Louis, Union traffic Management Enhancements

Closes 10/20/2026Opened 9/14/2026

City of York·Nebraska

63% match

York, NE, York Industrial Subdivision - Infrastructure Improvements, one half mile West of N Division Ave, North of West 25th Street, York, NE - 2026

Closes 10/27/2026Opened 10/7/2026

The University of North Carolina·North Carolina

63% match

Campus Steam and Condensate Improvements - Package B-Revised

Closes 10/15/2026Opened 9/16/2026

University of Minnesota·Minnesota

63% match

St. Paul Residence Hall

Closes 10/28/2026Opened 10/2/2026

Michigan Morenci Area Schools·Michigan

63% match

Morenci Area Schools: Elementary and MiS/HS Renovations

Closes 10/28/2026Opened 10/8/2026

Nyack Public Schools·New York

63% match

Capital Projects Update 6-6-23(opens in new window/tab)

Rolling / TBD closeOpened 3/5/2024

Missouri Department of Transportation·Missouri

63% match

SE District, City of Dexter, add additional walk trail(s) connecting the Dexter High School and the Dexter Middle School.

Closes 10/19/2026Opened 9/14/2026

San Bernardino City Unified School District·California

62% match

Bid No. 27-09 Infrastructure Equipment, Cabling and Services

Closes 10/27/2026Opened 9/29/2026

Lewisville ISD·Texas

62% match

Datacenter Network Refresh

Closes 11/6/2026Opened 10/2/2026

Metropolitan Airports Commission·Minnesota

62% match

2026 GO Building Improvements

Closes 10/13/2026Opened 9/30/2026

Michigan Morenci Area Schools·Michigan

62% match

Morenci Area Schools: Elementary and MiS/HS Renovations

Closes 10/28/2026Opened 10/9/2026

Miami-Dade County·Florida

62% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

St. Tammany Parish School Board·Louisiana

61% match

Mandeville Elementary School, Renovations and Additions, STPSB Project No. 2545

Closes 10/29/2026Opened 9/23/2026

Hastings Utilities·Nebraska

61% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

San Gabriel Unified School District·California

61% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

San Jacinto College·Texas

61% match

CSP 27-01 Electrical Upgrades, Buildings C30, C31, C32

Closes 10/14/2026Opened 9/16/2026

Midland ISD·Texas

61% match

Property Sale: MAP Campus: 2101 W. Missouri Ave.

Closes 10/21/2026Opened 9/23/2026

Town of Strasburg·Virginia

61% match

Strasburg Police Station Renovation

Closes 10/19/2026Opened 9/4/2026

St. Tammany Parish School Board·Louisiana

61% match

Boyet Jr. High School, Infrastructure and Coordination for Modulars, STPSB Project No. 2511

Closes 10/15/2026Opened 9/16/2026

City of Charlotte·North Carolina

61% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Eden Prairie·Minnesota

61% match

Flying Cloud Trail Improvements

Closes 10/29/2026Opened 10/9/2026

Department of Behavioral Health and Developmental Disabilities·South Carolina

61% match

Anderson MHC Building Improvements

Closes 10/28/2026Opened 9/18/2026