Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Water and Wastewater
  5. ›CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683…

City of San Bernardino·California

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026$600k – $1.8MRequest for Quotation
Get bids like this by emailBid source

Description

The City of San Bernardino is soliciting bids to design, fabricate, install, and commission 120 stainless‑steel Connector Pipe Screens (CPS) at municipal catch‑basin locations. The contractor must clean existing basins, install screens per detailed technical specifications, provide warranties, and submit extensive documentation (as‑built drawings, payroll records, CARB compliance certificates, etc.). The work must be completed within 90 calendar days of the Notice to Proceed, with liquidated damages of $1,500 per day for delays. • Scope includes cleaning, surveying, fabrication, installation, and final inspection of CPS units. • Technical specs require 304 stainless‑steel frames, 14‑gauge perforated screens, and stainless‑steel hardware. • Mandatory bonding and insurance: 10 % bid bond, 100 % performance and payment bonds, and minimum commercial liability coverage.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michelle Parra

[email protected]

(909) 998-2123

Key dates

Opened
10/26/2026
Questions due
11/9/2026
Closes
11/23/2026
Duration
90 days

Last updated

Details

Type
Request for Quotation
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
RFQ F-26-4070

Budget estimate

$600,000 – $1,800,000

No contract value is disclosed. Assuming each CPS unit (including design, fabrication, installation, warranty, and documentation) costs between $5,000 and $15,000, the total project value would range roughly from $600,000 (120 × $5k) to $1,800,000 (120 × $15k). This estimate accounts for material costs, labor, bonding, insurance, and overhead typical for municipal infrastructure projects in California.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Texas City of San Antonio·Texas

Top match · 84%

ANNUAL CONTRACT FOR CARBON STEEL PIPE AND ACCESSORIES FOR PUBLIC WORKS DEPARTMENT

Closes 11/13/2026Opened 10/28/2026

North Carolina Orange Water & Sewer Authority·North Carolina

81% match

Construction

Closes 11/10/2026Opened 10/19/2026

The Metropolitan Water District of Southern California·California

81% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Bellevue·Washington

80% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Orange County Sanitation District, CA·California

80% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

Saline County·Kansas

80% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Rancho Palos Verdes·California

80% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

San Antonio Water System·Texas

80% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

City of Cleveland·Ohio

80% match

120-26 - Constructing & Installing Replacement Sewers & Repairing & Rehabilitation of Existing Sewers

Closes 12/2/2026Opened 10/29/2026

City of Chula Vista·California

80% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Long Beach·California

80% match

On-Call Construction

Closes 11/25/2026Opened 10/21/2026

Eastern Municipal Water District·California

80% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Austin·Texas

79% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

Texas City of San Antonio·Texas

79% match

Citywide On-Call Plumbing Services

Closes 11/20/2026Opened 10/5/2026

Gary Sanitary District·Indiana

79% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

Georgia City of Sandy Springs·Georgia

79% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of West Des Moines·Iowa

79% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Shawnee·Kansas

79% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

The Metropolitan Water District of Southern California·California

79% match

Western Region Security Upgrade

Closes 11/19/2026Opened 9/24/2026

City of South San Francisco·California

79% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

Maryland Baltimore City Department of Public Works·Maryland

79% match

W.C. 1456-Lead Pipe Inspection and Replacement

Closes 11/4/2026Opened 10/7/2026

City of Cortez·Colorado

79% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

San Francisco Water Power Sewer·California

79% match

WD-2914 Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Pipeline Repairs

Closes 11/19/2026Opened 10/8/2026

City of Port St. Lucie·Florida

79% match

Pressure Cleaning Services

Closes 11/20/2026Opened 10/20/2026

City of San Jose·California

79% match

Miscellaneous Sanitary Sewer Repairs FY 2025-2026 Package II

Closes 11/12/2026Opened 10/14/2026