The San Antonio Water System (SAWS) is seeking a qualified contractor to perform a one‑time cleaning and removal of lime‑slurry solids from a 54‑inch steel pipeline segment at the Agua Vista Water Treatment Plant. The scope includes labor, tools, equipment, supervision, mobilization/demobilization, disposal, video and photographic documentation, and quality control. Work must be completed within a seven‑day scheduled shutdown (December 6‑12 2026) after SAWS removes and later reinstalls upstream/downstream components. Bids are due electronically or by sealed envelope by November 5 2026. A non‑mandatory pre‑bid conference/site visit will be held on October 27 2026.
• Location: Agua Vista Station, 20015 Hardy Oak Blvd., San Antonio, TX
• Scope: Pipe cleaning, debris removal, documentation, disposal, and related services
• Schedule: 7‑day shutdown window Dec 6‑12 2026; bid submission deadline Nov 5 2026
• Mandatory insurance requirements (WC, EL, CGL, AL, UL, Pollution Liability)
• Pre‑bid conference: Oct 27 2026, 10:00 a.m. CT (non‑mandatory)
• Contact: Gilberto Reyna, Purchasing Dept., (210) 233‑3316, [email protected]