Texas State University is seeking a qualified General Contractor to execute the Mitte HVAC Renovation project. The work involves the complete renovation of 18 existing hydronic air‑handling units (AHUs) across the JC & RF Mitte building, including demolition, replacement of fans, coils, VFDs, control systems, ductwork, pipework, structural supports, fire/smoke dampers, and full commissioning/testing. The contractor must provide all labor, materials, equipment, and coordination, comply with university‑specific construction, safety, and documentation standards, and submit required subcontracting plans (including VetHUB participation). The award will be based on a 60 % technical qualification and 40 % price evaluation.
• Scope: Mechanical, electrical, and controls work for 18 AHUs plus optional full replacement of three roof‑mounted units.
• Requirements: General contractor with experience on university/large‑scale HVAC retrofits, ability to meet Texas prevailing‑wage, bonding, insurance, and VetHUB subcontracting mandates.
• Schedule: Pre‑proposal conference mandatory 29 Oct 2026; sealed proposals due 20 Nov 2026; construction slated for the summer of 2026.