Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›2026 CIP Water Pipeline Replacement Project

City of Redlands·California

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026$200k – $400kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Redlands is seeking qualified contractors to replace approximately 3,500 linear feet of aging water transmission pipeline throughout the city. The work includes furnishing and installing new ductile‑iron and HDPE pipe (8‑ to 24‑inch diameters), associated valves, fire hydrants, service connections, traffic control, utility relocation, pavement removal and restoration, earthwork, testing, disinfecting, and final as‑built documentation. The contract is valued at roughly $4 million, requires a 10 % bid bond, 100 % performance and labor‑and‑material bonds, and mandates a California Class A or C‑34 contractor’s license. The project must be completed within 100 working days, with liquidated damages of $500 per day for delays. • Replace ~3,500 ft of water mains (8‑24 in.) with ductile‑iron, HDPE, and cement‑mortared pipe. • Install valves, fire hydrants, service connections, and a 12‑in. Hydra‑Stop insertion valve. • Provide traffic control, utility location, pavement removal/repair, SWPPP, testing, and as‑built drawings. • Required bonds: 10 % bid bond; 100 % performance and labor‑and‑material bonds; 5 % retention. • Contractor must hold a California Class A or C‑34 license and be DIR‑registered.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Elva Arellanes(Project Manager)

[email protected]

(909) 798-7584

Key dates

Opened
10/29/2026
Questions due
11/6/2026
Closes
11/16/2026
Duration
100 working days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
501071

Budget estimate

$200,000 – $400,000

The solicitation lists an estimated project value of $4 million. Assuming typical contractor net profit margins for municipal water‑utility construction (5‑10 %), the expected earnings for the prime contractor would fall roughly between $200,000 and $400,000, not including potential change‑order revenue. Factors influencing the final budget include the quantity of unforeseen work (a $400,000 lump‑sum allowance is included), the number of change orders, and any cost‑saving efficiencies realized during execution.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Beaumont·California

Top match · 87%

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Eastern Municipal Water District·California

85% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Chula Vista·California

85% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

The Metropolitan Water District of Southern California·California

85% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Austin·Texas

84% match

Lower Fort Branch Basin - Wastewater Pipeline Renewal

Rolling / TBD closeOpened 10/5/2026

City of Charlotte·North Carolina

84% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Georgia City of Sandy Springs·Georgia

84% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

Georgia City of Cartersville·Georgia

84% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Edgewater, FL·Florida

84% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Holly Grove·Arkansas

84% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of DeLand·Florida

84% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Redlands·California

84% match

REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID

Closes 11/12/2026Opened 9/30/2026

City of Augusta, GA (Augusta Commission)·Georgia

83% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Tarrant Regional Water District·Texas

83% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of San Bernardino·California

83% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Shawnee·Kansas

83% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Red Oak·Texas

83% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026

City of Cortez·Colorado

83% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

City of Hollywood·Florida

83% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Bellevue·Washington

83% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Bellevue·Washington

83% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Rockford·Illinois

83% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City Utilities·Indiana

83% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

Bristol Virginia Utilities Authority·Virginia

83% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Philadelphia·Pennsylvania

83% match

PW Bid 2505- RELAY of WATER MAINS in ADAMS AVE from E. WINGOHOCKING ST. to 250' NORTH of UNITY ST

Closes 11/10/2026Opened 10/28/2026