Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Engineering Services
  5. ›Engineering Design Services for the Turner Avenue Storm…

City of Ontario·California

Engineering Design Services for the Turner Avenue Storm Drain and Street Improvement Project (SM2701)

Closes 11/12/2026$1M – $2.5MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Ontario is seeking a qualified engineering firm to provide design services for the Turner Avenue Storm Drain and Street Improvement Project (SM‑2701). The scope includes a two‑phase effort: Phase I – preliminary engineering, feasibility study, utility and right‑of‑way research, aerial topography, preliminary hydrology and hydraulics, alternative designs with cost estimates, environmental research and outreach; Phase II – optional final design, detailed plans, specifications, estimates, full hydrology‑hydraulics report, topographic survey, geotechnical investigations, permitting, right‑of‑way acquisition, public outreach, and construction support. The consultant must be licensed in California, comply with prevailing‑wage requirements, and carry the specified insurance. Proposals must be submitted electronically and in hard copy by the November 12, 2026 deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

(909) 395-2012

Key dates

Opened
10/15/2026
Questions due
10/29/2026
Closes
11/12/2026
Projected award
12/15/2026

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
2024

Budget estimate

$1,000,000 – $2,500,000

No total compensation is disclosed; based on comparable municipal engineering design projects of similar size (≈550 ft roadway and storm‑drain), a full‑scope design‑build effort typically ranges from $1 million to $2.5 million. Phase I alone may be $400 k–$800 k, with Phase II (if exercised) adding $600 k–$1.7 M. The estimate reflects labor rates, geotechnical borings, surveys, permitting, and construction‑support services.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ontario·California

Top match · 85%

Engineering Design Services for Archibald Avenue At-Grade Railway Crossing Safety Improvements Federal Project No. STPLR-7500(311)

Closes 10/22/2026Opened 10/1/2026

City of Rapid City·South Dakota

83% match

East Anamosa Street Extension – Diamond Ridge Blvd to Turbine Dr, TIFD 103

Closes 10/23/2026Opened 10/13/2026

City of Fort Myers·Florida

83% match

Downtown Stormwater Drainage Improvements - First Street Flood Risk Reduction Professional Services

Closes 10/30/2026Opened 9/28/2026

City of Port Arthur·Texas

83% match

ENGINEERING SERVICE FOR STREET & DRAINAGE PROJECTS

Closes 10/28/2026Opened 9/28/2026

City of Port Arthur·Texas

83% match

ENGINEERING SERVICE FOR STREET & DRAINAGE PROJECTS

Closes 10/28/2026Opened 9/28/2026

Sterling Heights·Michigan

82% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

City of Alhambra·California

82% match

PROFFESIONAL ENGINEERIGN DESIGN SERVICES (PS&E) FOR FY26/27 RMRA STREETS REHABILITATION PROJ

Closes 11/5/2026Opened 9/21/2026

Ramsey County·Minnesota

81% match

Vadnais Boulevard Professional Design Services

Closes 11/12/2026Opened 10/19/2026

Charleston·South Carolina

81% match

N. Nassau Street Pipe Replacement Project RFQ (Design Services)

Closes 10/30/2026Opened 10/7/2026

City of Lake Oswego·Oregon

81% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 10/29/2026Opened 9/29/2026

City of Richmond·Virginia

80% match

Stormwater Annual Engineering Services

Closes 10/23/2026Opened 9/23/2026

Maryland Chevy Chase Village·Maryland

80% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

South Tahoe Public Utility District·California

80% match

Engineering Services for Tanglewood and Sunset Well Control Buildings and Infrastructure Design

Closes 11/13/2026Opened 9/21/2026

Georgia Bartow County Government·Georgia

80% match

RFQ 26-35-007 Elm Street from Main Street to SR3 (GDOT PI#0021602) (CB-207)

Closes 10/23/2026Opened 9/17/2026

Massachusetts City of Newburyport·Massachusetts

80% match

IFB No. 27-13: Hale Street Drainage Project

Closes 10/28/2026Opened 10/14/2026

Cobb County, GA·Georgia

80% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Casper·Wyoming

80% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Georgia Cobb County Department of Transportation·Georgia

80% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Pee Dee Regional Council of Governments·South Carolina

80% match

Stormwater Drainage Study

Closes 12/1/2026Opened 10/20/2026

City of Culver City·California

80% match

Fox Hills Park Stormwater Capture Project Feasibility Study, PW-011

Closes 10/29/2026Opened 9/17/2026

Midway City Sanitary District·California

80% match

Brookhurst Lift Station Improvement Design Project

Closes 12/18/2026Opened 10/12/2026

City of Richmond Government·Virginia

80% match

RFP No. 2600020046 Stormwater Annual Engineering Services

Closes 10/23/2026Opened 9/30/2026

Nevada Government·Nevada

80% match

Carson City Centennial Park Drainage Project

Closes 10/22/2026Opened 9/30/2026

City of Flagstaff, AZ·Arizona

80% match

Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Closes 11/12/2026Opened 9/25/2026

Town of Los Gatos·California

80% match

709 University Avenue Drainage System Replacement Project

Closes 10/28/2026Opened 10/1/2026