This project calls for the complete removal of an existing asphalt parking lot, soil remediation, and reconstruction of a new asphalt surface, plus installation of electric‑vehicle charging infrastructure on California State University, Long Beach campus. It is a public‑works, sealed‑bid solicitation requiring California C‑12 or B contractor licensing, compliance with prevailing‑wage rules, and mandatory DVBE participation. The work includes heavy civil construction, site preparation, and electrical upgrades, with a construction window from early April to late July 2027.
• Remove existing 4‑in. asphalt and the top 18 in. of soil (including cement‑treated layers).
• Install non‑expansive fill compacted to ≥ 95 % relative compaction and place a minimum 4‑in. asphalt layer.
• Add one new EV charging station and convert nine EV‑ready stalls to full charging capability.
• Must attend a mandatory site walk on November 16, 2026 and be pre‑qualified via PlanetBids; DVBE participation of at least 3 % is required, with incentive tiers up to 3 % for higher participation.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.