The contract is for the AML Project 17.6D-Glenrock-9, Area C Drilling and Grouting Project, which aims to mitigate hazards and environmental degradation associated with underground coal mining. The project is funded by a grant from the Department of Interior. The scope of work includes drilling and grouting, and the project is anticipated to begin in Early April, 2025. The contract was awarded to Howard Concrete Pumping Co. and Nucor, Inc. Some key points about the contract include:
* The project is located in Glenrock, WY, adjacent to the City of Glenrock, off of Highway 87.
* The project is funded by a grant from the Department of Interior, CFDA 15.252 or the U.S. Department of Interior, CFDA 15.236.
* The work on this project is anticipated to begin in Early April, 2025.
* Bidders must submit the Pre-Qualification Information to the Engineer by February 11, 2025, at 5:00 p.m.
* Questions about the project must be submitted to the Engineer (BRS, Inc. at [email protected]) no later than 5:00 p.m. on February 13, 2025.