The RFP 25/09 contract covers the design, supply, and installation of a new ADA‑accessible playground addition at Battle Elementary School in Columbia, MO. PlayPower LT Farmington, Inc. was awarded the contract (Option 1) to provide multi‑unit playground equipment, ADA‑compliant pathways, swings, shade structures, musical play pieces, and related site work. The project includes a range of equipment options, with individual line‑item costs spanning from a few thousand dollars up to more than $24 k, and aggregate project totals ranging between roughly $150 k and $204 k. The award reflects a full and open competition process, with multiple vendors submitting bids, but only PlayPower received the award.
• Scope includes ADA‑accessible surfacing (Xgrass), multiple playground units (Little Tikes‑Playbuilder), shade structures, swing sets, music pieces, and climbers.
• Awarded vendor is a Missouri‑based playground equipment specialist; no subcontractors or additional awardees are listed.
• The contract appears to be a lump‑sum, fixed‑price award with no explicit term or renewal language provided.