Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Water and Wastewater
  5. ›City of Brentwood Water Treatment Plan Actuator and…

Contra Costa Water District·California

City of Brentwood Water Treatment Plan Actuator and Control System Upgrades

Closes 11/5/2026$1.3M – $1.6MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Brentwood Water Treatment Plant (CBWTP) upgrade replaces aging valve actuators and modernizes the plant’s control system. Work includes mechanical removal and installation of five actuator models (with one spare each), demolition of existing cable and network infrastructure, installation of new conduit, power, control and fiber‑optic wiring, and upgrades to control panels, PLC/RTU hardware, and network switches. The contractor must test, commission, and train CCWD staff on the new equipment, and handle associated civil, electrical, instrumentation, and safety compliance tasks. The project is subject to strict California OSHA, SWRCB, and prevailing‑wage requirements, with a mandatory plant‑shutdown window (Dec 13 2027 – Mar 31 2028) and liquidated‑damage penalties for schedule overruns. • Replace five types of valve actuators (one spare each) and perform associated mechanical work. • Install new power, control, and fiber‑optic infrastructure; modify and replace control panels, network switches, and related instrumentation. • Demolish existing cabling, provide civil‑electrical support (conduit, raceways, grounding), and complete testing, commissioning, and staff training. • Comply with Cal/OSHA, SWRCB permits, prevailing‑wage rules, and CCWD Contractor Safe Practices Handbook. • Schedule: NTP Jan 14 2027, 445‑day substantial completion, final completion by early May 2028, with a mandatory shutdown window Dec 13 2027 – Mar 31 2028.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joe Barnes(Construction Administrator)

[email protected]

(925) 490-5646

Key dates

Opened
10/1/2026
Questions due
10/22/2026
Pre-bid meeting
10/13/2026
Closes
11/5/2026
Duration
475 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
238210
Solicitation №
2773

Budget estimate

$1,300,000 – $1,600,000

The engineering estimate listed in the solicitation is $1,427,000. Adding typical mobilization, bonding, insurance, and a modest contingency brings the contract value to roughly $1.3 M–$1.6 M. Therefore the expected budget range for the successful bidder is between about $1.3 M and $1.6 M. This estimate assumes the full scope is awarded to a single prime contractor and does not account for any subcontractor mark‑ups.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

West Basin Municipal Water·California

Top match · 82%

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

The Metropolitan Water District of Southern California·California

81% match

Joseph P. Jensen Water Treatment Plant Infrastructure and Security Improvements

Closes 11/3/2026Opened 9/23/2026

City of Hollywood·Florida

81% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

West Basin Municipal Water District·California

81% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

California Department of Parks and Recreation·California

81% match

C26863016 HEARST SAN SIMEON SHM - Reservoir #3 Water Treatment Plant Upgrade

Closes 10/23/2026Opened 9/23/2026

Atwood Regional Water & Sewer District·Ohio

81% match

Wastewater Treatment Plant Improvements

Closes 10/28/2026Opened 8/21/2026

City of Stillwater·Oklahoma

80% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

City of Huntington Beach·California

80% match

CC 1698 - Well 4 Facilities Upgrades

Closes 10/29/2026Opened 10/7/2026

City of Hollywood·Florida

79% match

Chlorine Facility Maintenance WWTP

Closes 10/28/2026Opened 10/21/2026

City of Richland·Washington

79% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

City of Redlands·California

79% match

REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID

Closes 11/12/2026Opened 9/30/2026

City of Roseville·California

79% match

Construction Services: DCWWTP Primary Sedimentation Basin Rehabilitation Project

Closes 10/27/2026Opened 8/25/2026

Connecticut City of Bristol·Connecticut

79% match

Diffused Aeration System Replacement

Closes 10/23/2026Opened 9/25/2026

Central Florida Tourism Oversight District·Florida

79% match

ECEP Cooling Tower Basin Improvements

Closes 10/26/2026Opened 9/24/2026

City of Lakeland·Florida

79% match

Annual Water Treatment Plant High Service Pump Maintenance Contractor

Closes 10/29/2026Opened 10/5/2026

City of Santa Barbara·California

79% match

Transmission Main Renewal Phase 2

Closes 10/23/2026Opened 9/10/2026

City of Palm Springs·California

79% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/9/2026Opened 10/13/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

79% match

Wastewater Treatment Plant Upgrades – Albert C. Wagner Correctional Facility

Closes 10/22/2026Opened 9/3/2026

City of Santa Rosa·California

78% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 10/27/2026Opened 9/29/2026

City of Hollywood·Florida

78% match

Headwork Scrubber Rehabilitation (Project No. 23-9219)

Closes 11/10/2026Opened 10/6/2026

City of Spring Valley, Minnesota·Minnesota

78% match

Spring Valley, City of Wastewater Treatment Facility Improvements

Closes 10/27/2026Opened 10/16/2026

New York City Department of Environmental Protection·New York

78% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

City of Sioux City·Iowa

78% match

WASTEWATER TREATMENT PLANT FACILITY PLAN PHASE 1 IMPROVEMENTS PROJECT

Closes 10/29/2026Opened 10/14/2026

Western Municipal Water District·California

78% match

WRCRWA Primary Clarifier #2 Rehabilitation

Closes 10/26/2026Opened 9/24/2026

City of Columbia·South Carolina

78% match

WM4830-03 Canal WTP Filter Rehabilitation and Valve Replacements

Closes 10/30/2026Opened 9/11/2026