Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Colorado
  4. ›Closed bids
  5. ›Professional Engineering Services Consultant for Phase 2 Wastewater…

Awarded contract·City of Grand Junction·Colorado

Professional Engineering Services Consultant for Phase 2 Wastewater Treatment Plant Expansion

Won by AE2S$3MSingle Award
Contract source

Awarded vendors

  • AE2S

Description

This solicitation seeks a professional engineering consulting firm to provide design, oversight, and technical services for the Phase 2 expansion of a municipal wastewater treatment plant. The work includes detailed engineering design, permitting support, construction‑phase services, and coordination with local utilities to increase treatment capacity. The contract is being awarded through a full and open competitive process, with AE2S identified as the awardee. Key points: • Scope: Engineering design and construction‑management services for wastewater plant expansion. • Awarded to: AE2S (Lone Tree, CO) – a firm specializing in water‑related infrastructure. • Process: Proposal opening on May 21 2026; competitive solicitation (RFP‑5892‑26‑DD) issued by the City of Grand Junction.

Attached files

Key dates

Bids closed
5/21/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP-5892-26-DD

Contract value

$3,000,000

No monetary figures appear in the provided excerpt. Similar municipal wastewater plant expansion engineering contracts typically range from $1 million to $5 million, depending on project size, design complexity, and duration. Given that this is a Phase 2 expansion (often a substantial but not full‑plant redesign) and that AE2S is a mid‑size consulting firm, a reasonable midpoint estimate is roughly $3 million. This accounts for design services, permitting, construction‑phase oversight, and contingency.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Richmond·Virginia

Top match · 78%

Wastewater Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

City of Bakersfield·California

76% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Town of Narragansett·Rhode Island

76% match

Professional Engineering Services for Wastewater Projects

Closes 10/20/2026Opened 10/20/2026

East Bay Municipal Utility District·California

76% match

Power Generation System Master Plan Project

Closes 10/16/2026Opened 9/8/2026

City of Redding·California

76% match

5719 - Consultant Services for Clear Creek Wastewater Treatment Plant Supervisory Control and Data Acquisition (SCADA) Upgrades ** Addendum No. 1 Issued 10/9/2026

Closes 10/29/2026Opened 9/15/2026

City of Temple Terrace, FL·Florida

76% match

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026

City of Richmond Government·Virginia

76% match

RFP No. 270005936 Wastewater Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

City of Austin·Texas

75% match

Northeast Plant Expansions for Wild Horse, Taylor Lane, and

Rolling / TBD closeOpened 7/27/2026

City of Richmond·Virginia

75% match

Water Annual Engineering Services

Closes 10/30/2026Opened 9/30/2026

City of Phoenix·Arizona

75% match

SUB-REGIONAL OPERATING GROUP - 91ST AVENUE WASTEWATER TREATMENT PLANT AERATION REHABILITATION - ENGINEERING SERVICES

Closes 10/16/2026Opened 9/24/2026

City of Hollywood·Florida

75% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)

Closes 11/17/2026Opened 10/13/2026

Fort Pierce Utilities Authority·Florida

75% match

Water & Wastewater Systems Continuing Professional Engineering and/or Design Services

Closes 11/2/2026Opened 10/6/2026

City of Port St. Lucie·Florida

75% match

Professional Water Management Consulting Engineering Services for Commercial Irrigation Monitoring, Technical Support, and CUP Compliance

Closes 10/15/2026Opened 9/10/2026

Town of Narragansett·Rhode Island

75% match

Professional Engineering Services for Wastewater Projects

Closes 10/20/2026Opened 9/25/2026

City of Hollywood·Florida

75% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER TREATMENT PLANT PROGRAM MANAGEMENT (PROJECT NO. 26-1351)

Closes 11/10/2026Opened 10/6/2026

City of Glendale·California

75% match

On-Call Water Resources and Engineering Consulting Services

Closes 10/19/2026Opened 9/14/2026

City of Roseville·California

75% match

Design-Assist Construction of Pleasant Grove Wastewater Treatment Plant Electrical Power System Capacity Expansion Project

Closes 10/28/2026Opened 9/2/2026

Fort Pierce Utilities Authority·Florida

74% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

City of Port Angeles·Washington

74% match

RFQ Water & Wastewater SCADA System Upgrade

Closes 10/21/2026Opened 9/10/2026

City of Bakersfield·California

74% match

RFQ - Consulting Services for Water Well CBK-81 Construction and L-211 TCP & H2S Treatment

Closes 11/3/2026Opened 10/13/2026

City of Madison·Wisconsin

74% match

PFAS Testing of Wastewater and Biosolids Consultant

Closes 10/30/2026Opened 10/6/2026

City of Fresno·California

74% match

Mailbox Only - RFQ for Owner's Advisor Services for the 1,2,3-Trichloropropane (TCP) Water Treatment Project

Closes 11/3/2026Opened 9/22/2026

Maryland Mayor and Town Council of Oakland·Maryland

74% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

Sarasota County·Florida

74% match

Engineering Services for Carlton Water Treatment Plant Backup Power Improvements

Closes 10/15/2026Opened 9/1/2026