Chapel Hill Independent School District (CHISD) is seeking qualified commercial roofing contractors to completely replace the existing roof on the Bloodsworth Gym at Chapel Hill High School. The scope includes full tear‑off, disposal, deck repair, installation of a GAF 60‑mil TPO membrane (or approved equal) with RhinoBond attachment, new gutters/downspouts, edge metal, flashings, and a five‑year preventative‑maintenance program with bi‑annual inspections. The contractor must provide all labor, materials, equipment, permits, inspections, warranties (20‑25‑year manufacturer warranty and 5‑year workmanship warranty), and maintain safety and insurance compliance. The project area is 12,142 sq ft of flat roof, and CHISD expects the work to be completed in the shortest reasonable timeframe while coordinating with school operations. Bids are due electronically by 2 PM CST on 29 Oct 2026; a mandatory pre‑bid walk‑through is scheduled for 13 Oct 2026. Evaluation will consider price (30 %), qualifications (25 %), past relationship (25 %), and experience/references (20 %).
• Full roof tear‑off and deck preparation for 12,142 sq ft flat roof
• Install GAF 60‑mil TPO membrane with RhinoBond (or approved equal)
• Replace gutters, downspouts, edge metal, flashings, and related accessories
• Provide 5‑year preventative‑maintenance program (two inspections per year)
• Deliver 20‑25‑year manufacturer warranty and 5‑year workmanship warranty
• Meet all OSHA, Texas, local code, and CHISD safety/insurance requirements
• Coordinate schedule to minimize disruption to school activities